SkyscraperCity Forum banner
1 - 11 of 11 Posts

·
Registered
Joined
·
4,362 Posts
As outline proposals go it sounds promising, 33 & 22 stories of residential is showing real confidence. Materials wise, I saw mention of it being metal clad with stone look and bronze mentioned (no aluminium, at least so far) with glazed frontages at street level. Look forward to seeing the full application for more details.
 

·
Registered
Joined
·
4,362 Posts
Looks like a full planning application will quickly follow the pre-app if the images above are anything to go by, wonder if we will see many changes after they get feedback.
 

·
Registered
Joined
·
4,362 Posts
Very positive result, but don’t the plans panel members go on and on about the same things!! Once one of them pipes up, particularly about the screen to between the path and the ring road, they all have to jump in with the same comments. It’s no wonder they were running massively late.

Let’s hope come April we have another major scheme starting although that seems a very ambitious time scale to mechanically design, source and procure everything across all the 4 buildings.
 

·
Registered
Joined
·
4,362 Posts
All indications are that is the case, with the exception of the office building which only has outline permission. There was talk of operators being in place for the PRS/Student/Hotel elements during the plans panel presentations.
 

·
Registered
Joined
·
4,362 Posts
Fantastic news, such confidence being shown in Leeds by some major investors. Great to see RG Group building another major scheme, a contractor that fills me with confidence.

There has been a lot of activity on the portal on this application recently with amended documents being uploaded, another sign it's gearing up for a start.
 
1 - 11 of 11 Posts
Top