Joined
·
3,650 Posts
Having been involved in an unsuccesful bid for this site previously, LCC wanted a clear public footpath (not necessarily cycle) connecting with the bridge across the IRR to tie in with a potential replacement for the bridge or at least much improved landing points. As such there is probably a buffer zone against the road in part to facilitate this - the building layout looks to try and send pedestrians around either side of the site rather than through it straight up to the bridge.