Madurai | 7KM | NH 785 Elevated Highway | Pandian Hotel to Chettikulam

74971 Views 163 Replies 41 Participants Last post by  Ramesh-NTM
Construction tender released for this project!

NATIONAL HIGHWAYS AUTHORITY OF INDIA [NHAI]

Construction of 4-lane Elevated Corridor and Ground Level improvements
from Pandiyan Hotel Junction (KM 0/000) to Chettikulam (KM 7/300) of
Madurai Natham Section(Package-1) of NH-785 on EPC Mode under
Bharatmala Pariyojana Phase-I in the state of Tamil Nadu


http://www.nhai.gov.in/writereaddata/Portal/Tender/OtherDocuments/898/5_FEASIBILITY_REPORT.pdf

ELEVATED CORRIDOR (Km 0+000 to Km 7+300)
 Prestressed Concrete Segmental Box Girder type of superstructure is proposed for the
Grade Separator from chainage Km 0+000 to Km 7+300.
 Entry Ramp on RHS from Ch. 2+583 to Ch. 2+863, Exit Ramp on RHS from Ch.
2+758 to Ch. 3+038 near Naganagulam Lake.
 Entry Ramp on LHS from Ch. 4+548 to Ch. 4+833 and Exit Ramp on RHS from Ch.
4+548 to Ch. 4+833 near Yadava College.
 Aesthetically pleasing architectural features for each piers of Elevated corridor are proposed indicating Tamilnadu heritage and history of Meenakshi Amman like the ones featured in the pillars of thousand pillars Mandapam.

http://www.nhai.gov.in/tenders-current-details.htm?id_898
See less See more
  • Like
Reactions: 1
101 - 120 of 164 Posts
Cross posting as both the stretches of Madurai Chettikulam, Chettikulam Natham are mentioned as much delayed NH projects by union government. Don't know the status of Natham Thuvarankurichi though.

Road junction at Thuvarankurichi seem to have got completed since the diversions are all removed & vehicles in Madurai Trichy are taking Thuvarankurichi bypass in both directions.

Thanks & Regards
Ramesh
See less See more
  • Like
Reactions: 2


Madurai-Natham four-laning project to be completed by July

75% of work of 7.3 km elevated corridor completed


The National Highways Authority of India has set July 2022 as the target for completing the Madurai-Natham fourway road project, including the elevated corridor for 7.3 km from Chokkikulam to Oomachikulam on New Natham Road.

The work that started in November 2018 and was scheduled to be completed in November 2020 got delayed due to COVID-19 lockdown and the consequent lack of workforce, mostly guest workers from North Indian States, who returned home due to fear of pandemic.

“The work that stopped during the first lockdown never gained momentum as the strength of the workforce came down drastically. The workers from Bihar and Chhattisgarh preferred to work in their nearby States rather than coming all the way down to Madurai,” an official said.

75% work completed: NHAI sources said that 75% of the elevated corridor work and 75% of the four-laning work between Oomachikulam and Natham has been completed.

Out of the 187 spans planned for the elevated corridor, the work of only five spans remained to be completed. “This is mostly in the city side – near Periyar statue junction and Gokhale Road,” the official added.
The dense bitumen macadam (bottom layer of road) has been laid for over 6 km under the elevated corridor. “We need to complete the side drains and then complete the DBM work for nearly 1 km. Other works pending are paving of the bituminous concrete (top layer) over the concrete slab on the elevated corridor,” he added.

Madurai City police have facilitated diversion of road traffic at Periyar statue junction to help NHAI take up the ramp connecting Alagarkoil Road and Dr. Ambedkar Road (Corporation office road).
Though the diversion was simultaneously planned at Gokhale Road to take up the ramp work behind Madurai Kamaraj University College, choking up of traffic forced the police to abandon the idea.
“We will complete the work at Periyar statue junction in little over one month and then take up the work on the other side (Gokhale Road),” he said.

Meanwhile, the NHAI officials have instructed the contractor to complete the drain work between Armed Reserve grounds and P.T.R. Palanivel Rajan statue junction ahead of Chithirai festival.
Since thousands of devotees would gather on this road to perform ‘ethir sevai’ to Lord Kallazhagar, the officials want to make the road and drains smooth to avoid any untoward incident.
The laying of finer course of bitumen (top layer) of the road under the elevated corridor would be laid in July as the officials want undulation on the road dug up to erect piers to get set.

Attachments

See less See more
2
  • Like
Reactions: 5
Here are some aerial shots of the Natham Highway. Picture quality is not good due to hazy weather.




















Weather didn't give a good chance for cleaner pictures. :(
See less See more
6
  • Like
Reactions: 5
மதுரை வைகையில் கழிவுநீர் கலப்பதை தடுக்க ரூ.74 கோடி திட்டத்துக்கு அரசு ஒப்புதல் வழங்கியுள்ளது

  • Like
Reactions: 3
7.5km long flyover Update. Swing fast
  • Like
Reactions: 1
Yes.. is it 4 lane or what is the configuration?
Yes.. is it 4 lane or what is the configuration?
i could not see the video. If your question is about the elevated flyover, it is 4 lane throughout the stretch except the entry/exit ramps
Yes.. is it 4 lane or what is the configuration?
It's a 4 lane only complete strech may be that video angles was not good ...14 m for carriageway, 2.5 m paved shoulder and 1 meter of median
  • Like
Reactions: 5
In this Elevated high way main structure construction is over .only thirupalai down Ram up only pending.
In this Elevated high way main structure construction is over .only thirupalai down Ram up only pending.
That is also finished a couple of weeks ago
That is also finished a couple of weeks ago
Not yet finished in thirupalai EB office side yesterday only went that area