Madurai | 7KM | NH 785 Elevated Highway | Pandian Hotel to Chettikulam

72217 Views 159 Replies 40 Participants Last post by  Smile_always
Construction tender released for this project!

NATIONAL HIGHWAYS AUTHORITY OF INDIA [NHAI]

Construction of 4-lane Elevated Corridor and Ground Level improvements
from Pandiyan Hotel Junction (KM 0/000) to Chettikulam (KM 7/300) of
Madurai Natham Section(Package-1) of NH-785 on EPC Mode under
Bharatmala Pariyojana Phase-I in the state of Tamil Nadu


http://www.nhai.gov.in/writereaddata/Portal/Tender/OtherDocuments/898/5_FEASIBILITY_REPORT.pdf

ELEVATED CORRIDOR (Km 0+000 to Km 7+300)
 Prestressed Concrete Segmental Box Girder type of superstructure is proposed for the
Grade Separator from chainage Km 0+000 to Km 7+300.
 Entry Ramp on RHS from Ch. 2+583 to Ch. 2+863, Exit Ramp on RHS from Ch.
2+758 to Ch. 3+038 near Naganagulam Lake.
 Entry Ramp on LHS from Ch. 4+548 to Ch. 4+833 and Exit Ramp on RHS from Ch.
4+548 to Ch. 4+833 near Yadava College.
 Aesthetically pleasing architectural features for each piers of Elevated corridor are proposed indicating Tamilnadu heritage and history of Meenakshi Amman like the ones featured in the pillars of thousand pillars Mandapam.

http://www.nhai.gov.in/tenders-current-details.htm?id_898
  • Like
Reactions: madhan
121 - 140 of 160 Posts
The government can spend crores and crores on developing places ..but after some months .. people are going to make it look shabby yet again. Shame !
Wherever i ask , everyone is saying that this bridge is going to be opened soon ..but what about painting the whole bridge ?
Then what about the statues which were planned for all the pillars ? Just 1 or 2 has been completed with azhagar and Meenakshi Amman ...what about the rest ?

What about beautification of the reservoirs nearby?
Only part of bridge is getting opened first,from oomachikulam to alagar Kovil road,they are opening very soon,ramps, paintings and other side will take 45 days-3 months
Wherever i ask , everyone is saying that this bridge is going to be opened soon ..but what about painting the whole bridge ?
Then what about the statues which were planned for all the pillars ? Just 1 or 2 has been completed with azhagar and Meenakshi Amman ...what about the rest ?

What about beautification of the reservoirs nearby?
  • Like
Reactions: Smile_always
looks good. With heavy commercialization, the lower level is going to be heavily congested with half to one-lane being occupied by vehicles for parking and only one lane being available for traffic.
Elevated corridor on New Natham Road scheduled to be commissioned in January 2023