SkyscraperCity banner

1 - 20 of 97 Posts

·
Registered
Joined
·
1,955 Posts
Discussion Starter #1
Al-Shamiya
















A New Horizon for the Holy Sanctuary of Mecca

“Al-Shamiya” project is considered one of Al-Oula most ambitious projects, through which the Company seeks to provide the highest international specifications in consistency with the significance of the location falling within the holy sanctuary of Mecca to the north of the Haram Mosque. The project gives an ambitious and practical vision to the north of the Haram Mosque.



• Location & Area:

Al-Shamiya project is located within a series of developmental projects launched by the Government with a view to developing and rehabilitating the region surrounding the holy sanctuary of Mecca to meet the needs of its visitors. This project covers an area of one million five hundred thousands square meters approximately, extending from the extremities of the sanctuary to beyond the second circular road to the north and from the Holy Mosque Street to the east and Jabal al Qaaba road to the west.

The plan includes Al-Shamiya, Garoul, Alqarara wa Alnqa. The area to be developed reached three million square meters distributed among different activities, of which hotels, hotel residences, commercial centers, and markets, general services, in addition to permanent residences for the people of the region and the relevant services. The project can accommodate about two hundred fifty thousands people and about four hundred thousand prayers.



• Services & Utilities

Al-Shamiya plan phases include the main pedestrian axes, the hotel course, which includes three levels separated by a wide street, surrounded by a group of hotels aligned in graduation and overlooking the sanctuary.

These groups of hotels are distinguished for being near the Haram square and overlooking it. Al-Qalaa residential project, which is a group of buildings at the top of Hindi Mountain intended for hotel residency and permanent housing, was developed in conformity with the urban rhythm.

The northern portal of the project, which is a principal landmark in the project, is composed of a distinguished tower located in the middle of a huge area surrounded by a group of medium buildings intended for commercial activities and shopping at the bottom of the square, cutting the portal station, and composed of five floors containing bus stations, car parking with a capacity for about 10500 cars and bus.



• Project’s Objectives

The project ‘s objectives lie in the development of an urban environment consistent with the position of the holy sanctuary of Mecca, the integration with the structural plan to develop the central region of Mecca, and the restructuring of the road network with a view of expanding the squares of the holy sanctuary to accommodate as many prayers as possible.

It also aims at providing public safety to the residents and visitors, reducing the pressure of urban development in the region located on the borders of the holy sanctuary directly, in addition to linking the internal regions of Al-Shamiya with the interests of the urban development, and distributing the real estate value of the development process.



• Development Phases:

Given the great deal of privacy of Al-Shamiya, Al-Oula raised its interaction rhythm since it became the principal owner of Al-Shamiya Company, and it elaborated the necessary studies to start the phases of the development. The development will necessitate a period of ten years at a total cost of 40 billion riyals, and it is undertaken through phases starting with developing the infrastructure and providing the location with all the services, thus escorting the most modern regions in the world.

The period of the first phase that is due to start soon is expected to last about three years. The project, which Al-Oula Company puts on its top of its future ambitious projects, was developed in coordination with the Higher Commission for the Development of Mecca and by following the planning and details directives and requirements established by the Commission, to keep the balance between the public and private interests.



 

·
Registered
Joined
·
242 Posts
Very Nice. I really hope that this project is realized. For some reason many projects in Saudi Arabia are proposed, garner a lot of interest and then just fade out or take about two years for the vision to be realized and construction to comence. I hope this is not the case with this one, and that it is developed soon. Looking forward to seeing construction photos of it!
 

·
Registered
Joined
·
1,955 Posts
Discussion Starter #3
completely agree. This project in particular has been on the table for about two years now. The good news is that they are still talking about it so it has not faded out.
 

·
Registered
Joined
·
6,553 Posts
OH MY GOD OH GOOOOD WHAT IS THAT!!!!!!!!!!!!!!!!!!!!!!!!!!:eek2: iseen it but i didnt think its like these BIG new city
 

·
Registered
Joined
·
1,955 Posts
Discussion Starter #7 (Edited)
What many don't know is that Emaar is a partner in this project.

It will be revealed in the coming real estate exhibit in jeddah.
 

·
Registered
Joined
·
6,553 Posts
do you know Riyadhi when real estate exhibit in jeddah will open?
 

·
Registered
Joined
·
707 Posts
does this mean theyre gonna knock down the makkah sofitel? i love that hotel! stayed there during hajj and many other times on previous visits..
 

·
Registered
Joined
·
11 Posts
Great, Big Projects started rolling

Thanks For The Info

Very Nice. I really hope that this project is realized. For some reason many projects in Saudi Arabia are proposed, garner a lot of interest and then just fade out or take about two years for the vision to be realized and construction to comence. I hope this is not the case with this one, and that it is developed soon. Looking forward to seeing construction photos of it!
Things are changing now

Now they are in a race to get there first, it is not like before they talk about it for a propoganda purpose, it is now : do it or someone else will
 

·
Registered
Joined
·
6,553 Posts
yah you are right amht, gulf countries now racing to get more investor.
 

·
Registered
Joined
·
6,553 Posts
24 Feb 2007
there no related betwen Shamya & Emaar,the tower constrition will start after 7 years & shamya project will done after 25 years:nuts: that what urban planning engineer sed.



















more pic's soon
 
1 - 20 of 97 Posts
Top