Joined
·
7,442 Posts
One thing to note guys is the usage of the building isn't cast in stone. Mr Ganzon really wants his building to be built, has been fighting the NIMBYs in courts for years, and is looking for various funding sources such as credit lines, IPO or even converting parts of the building into residential so he can pre-sell. There have been numerous articles about this project throughout the forum but isn't there one more outstanding issue? I think it should be due this month so can the Philippine forumers vigilantly watch out for it?
Aside from excavation, the work done so far is to strengthen the wall to prevent a collapse. Its sort of like the slurry wall in the WTC site in NYC where they try to prevent a wall collapse because of pressure from the nearby rivers.
This is a diagram of what they did to brace the site and prevent a collapse of the wall because of the MRT Line beside it.
This is what the site looks like today.
Aside from excavation, the work done so far is to strengthen the wall to prevent a collapse. Its sort of like the slurry wall in the WTC site in NYC where they try to prevent a wall collapse because of pressure from the nearby rivers.
This is a diagram of what they did to brace the site and prevent a collapse of the wall because of the MRT Line beside it.

This is what the site looks like today.
