Has anyone any more information on the new Mashhad - Golbahar New Town Suburban Line now that the construction is already visible on Google Satellite: https://www.google.co.uk/maps/@36.5478568,59.252113,695m/data=!3m1!1e3?hl=en
Like which is the operator (Is it also MURCO?)? What rolling stocks to be used? Will it be built as an extension to the existing Line 1 from Vakil Abad Metro Station or will the change of trains require some walking?

I see it drawn out on UrbanRail at http://www.urbanrail.net/as/mash/mashhad.htm but there is no further information. I found this article from 2014 which talks about the opening of the tender: http://www.railjournal.com/index.ph...hed-for-mashhad-–-golbahar-suburban-line.html

(And btw: Why is the MURCO website still not available in English? Quite embarassing, in particular after it was promised so often...)
 

·
Registered
Joined
·
416 Posts
Mashhad Metro line 3

Mashhad line 3 drilling reached Shohada Square at the depth of 40 meters. Pretty good speed I would say considering the low water table in the area.
Shohada square also serves line 2 station already in operation.
The 28.5' Km long Line 3 drilling is "scheduled" to finish in 2.5 years covering 24 Stations.








https://news.mashhad.ir/media_gallery
 

·
Registered
Joined
·
48 Posts
Great Job

Thanks for the news
Mashhad line 3 drilling reached Shohada Square at the depth of 40 meters. Pretty good speed I would say considering the low water table in the area.
Shohada square also serves line 2 station already in operation.
The 28.5' Km long Line 3 drilling is "scheduled" to finish in 2.5 years covering 24 Stations.








https://news.mashhad.ir/media_gallery
 

·
Registered
Joined
·
48 Posts
Mashhad line 2 Mofateh metrostation Starts Operation

Yesterday Mashhad line 2 Mofateh metro station Starts Operation. Right now in first phase of line 2, 8 kilometers with 7 stations are operated daily form 7 A.M to 1 P.
Tunnel excavation of line 3 with two TBM's has progressed more than 5 kilometers!
In 2016 more than 38.5 millions of passengers used line 1 as their means of transportation.
 

·
PC LOAD LETTER
Joined
·
7,516 Posts
when will service begin to Shariati station? It looked pretty much complete in the photos posted in July. Or is that Line 1 Shariati station?
 

·
Registered
Joined
·
48 Posts
Shariati Station

when will service begin to Shariati station? It looked pretty much complete in the photos posted in July. Or is that Line 1 Shariati station?
Line 2 has intersection with line 1 in Shariati station.
Those picture is for line2 part of Shariati station.
we are going to start operation of this station soon.
 

·
Registered
Joined
·
48 Posts
From Feb 2017 limited operation of the first phase of line 2 began. Mashhad urban railway system is connected to inter-urban railway system in Rahahan Station . In 20th march 2018 pilot operation of the first interchange station in Mashhad railway system was started. In 7th May 2018 Iranian Persident Hassan Rouhani took part in the inaguration ceremony of the first Mashhad Urban Railway interchange station "Shariati" which connects line 1 and 2.http://metro.mashhad.ir/news/5596671-.html currently line 2 operates from Saturday to Thursday with 10.1 km and 9 stations from 6 AM to 6 PM and the current headway is 15 minutes.
 

·
Registered
Joined
·
416 Posts
Mashhad Metro Line 3 progress

طی مراسمی با حضور شهردار مشهد مقدس دستگاه حفار تونل خط 3 متروی مشهد وارد ایستگاه باب*الجواد(ع) مشهد شد.
به گزارش پایگاه اطلاع*رسانی شهرداری مشهد مقدس، صبح امروز طی مراسمی با حضور استاندار خراسان رضوی، شهردار مشهد مقدس، رییس و اعضای شورای اسلامی شهر، جانشین قرارگاه خاتم*الانبیا (ص) و مدیران شهری دستگاه حفار تونل خط 3 مترو وارد ایستگاه باب*الجواد (ع) در مجاورت بارگاه حرم مطهر رضوی شد.
به گفته کیانوش کیامرز مدیرعامل شرکت قطارشهری مشهد دستگاه حفار پس از یک ماه توقف در این ایستگاه و انجام به روزرسانی*های لازم حفاری تونل خط 3 مترو را به سمت سیدی ادامه خواهد داد.





 

·
Registered
Joined
·
48 Posts
we are going to start the operation of Shahid Kaveh station soon(two intermediate stations between Shariati and Shahid Kaveh Station will be skipped for some time).
Currently we transfer more than 25000 passengers in line 2 and 120000 passengers in line 1 each day! Headway of line 2 is 10 minutes(all day long) and line 1 is 5 minutes in peak hour and 7 min in off peak hours.headway of line 1 in holidays is 12 minutes.
 