Saturday Shahid Kaveh Station Starts Operation

Saturday(27th July 2019) official Operation of line 2 Shahid Kaveh Station will be Started!
Two stations(Alandasht and Kouh Sangi) will be skipped for now and we may start their operation in a 3 to 4 month period.
Line 3 Tunnel Excavation is expected to finish in 1 year and operation of the first phase of line 3 will be held in 2021.
Also This Summer initial phase of Tunnel Excavation of Line 4 will be started.
 

·
Registered
Joined
·
48 Posts

·
Iranophile
Joined
·
41 Posts
For your information Mashhad Line 1 is not a heavy metro and is light rail transit (LRT) system with dedicated path (some part of it is underground, the other part is at grade).
Yes, this is captured like that in the OpenStreetMap data: Whole infrastructure and routes for Mashhad Metro line 1 is added as light_rail, see the route relation here: https://www.openstreetmap.org/relation/154407
The map I linked does not show it differently than the metro/subway line 2, but it's captured in the data.
 

·
Registered
Joined
·
48 Posts
Yes, this is captured like that in the OpenStreetMap data: Whole infrastructure and routes for Mashhad Metro line 1 is added as light_rail, see the route relation here: https://www.openstreetmap.org/relation/154407
The map I linked does not show it differently than the metro/subway line 2, but it's captured in the data.
Thank You
Today Shahid kaveh station Operation started.
https://metro.mashhad.ir/news/6993712-%D9%82%D8%B7%D8%A7%D8%B1%D8%B4%D9%87%D8%B1%DB%8C-%D9%85%D8%B4%D9%87%D8%AF-%D9%85%DB%8C%D8%AF%D8%A7%D9%86-%D8%B4%D9%87%DB%8C%D8%AF-%DA%A9%D8%A7%D9%88%D9%87-%D8%B1%D8%B3%DB%8C%D8%AF..html
 