Upon watching the video from News 5, sabi rin ni Sec. Villar i-eextend daw sa C3 yung ramp na may steel box girder as per SMC. Hanggang saang point kaya ng C3? Sana paabutin kahit man lang before dumating sa New Caloocan Interchange para kahit sa baba na dadaan mga trucks, atleast bawas traffic dun sa intersection nila sa Rizal Avenue.

My point as well kung doon nila ibabagsak yung ramp malapit dun, pwede mag exit mga trucks sa C3 off ramp ng Segment 10 tapos mag SS3 (yun eh kung papayagan sa Skyway ang trucks, may restrictions eh). Atleast kung tatawid sa Rizal Avenue, atleast bawas traffic.
 

·
Premium Member
Joined
·
4,490 Posts
^^ Parang bago ata makarating ng La Loma Cemetery yung on/off-ramps ng Skyway along C3-Caloocan.
 
  • Like
Reactions: Bruno14

·
Registered
Joined
·
24,603 Posts

·
Registered
Joined
·
24,603 Posts
^^ Malabo yan meh aspalto H by December, paniguradong wala yan sa soft opening hehehe

Possible naman na kahit 1x1 muna eh di yung SB lane eh aspaltuhan first, then pag natapos lipat sa NB naman, tapos installation ng streetlights, CCTVs, etc..tapos ayun, opening mainline with toll fee na.
 

·
Registered
Joined
·
24,603 Posts

·
Registered
Joined
·
24,603 Posts
Wala lang: managed to find in YT the very general render of Stage 3 that was uploaded six years ago originally in Vimeo, video here.

The render was more or less executed except for Section 2 which we all know deviated heavily due to possible mass civil unrest if all the love motels in Sta. Mesa were demolished 😅 Added were the Section 1 on / off ramps prior to Quirino Avenue and its extension, and of course Section 5, among others.

Dim's Sept update showed this:

547601


547605


Looking at the render video in Section 4, it indeed had 2 toll plazas, ss below:

547585


547586


547587


Looking forward to Dim's October update - expecting the Cherrylume Curve to be fully slab'ed already, and of course Section 2A/2B with girders finally completed for the main carriageway.
 

·
Registered
Joined
·
293 Posts
Open street map of connection to PUP for future connection to NLEX - SLEX connector, which will be above the railway connecting to NLEX harbour link segment 10 at C3 intersection.

 

·
Registered
Joined
·
800 Posts
^^Aayusin naman siguro yan. Yung section 1 inaspalto nila.
Speaking of section 1&2(before Pandacan), I was in Osmena Highway Quirino area today and travel was hell, Friday rush, lots of container trucks on the streets and the traffic was backed all along Osmena Highway. Obviously the construction of Nagtahan offramps is not helping. When will this part finish? Mainline is due in December. It is Oct next week, this area is still not done?
 

·