Yes, but now the route is diverted farther east - hopefully SMC would create an off ramp to Shaw/Kalentong area. Even just one lane (since the area has only 2 lanes in each direction. But given the lack of space in the area, we might have to live with just having the Araneta Ramps at SM centerpoint.
Since the route was realigned out of neccessity, It's now in Metro Pacific's court to decide if they want a ramp built there.
 

·
Registered
Joined
·
67 Posts
Since the route was realigned out of neccessity, It's now in Metro Pacific's court to decide if they want a ramp built there.
If the ramp is coming out of the San Juan river section, SMC still decides. A ramp to Shaw will service a great part of the Mandaluyong area. They have to demolish a significant part of the built-up area in Shaw to eke out a ramp on the tight 2x2 boulevard.
 

·
Registered
Joined
·
1,073 Posts
may poll na ba dito para mang hula kung magkano aabutin ng toll neto? feeling ko magiging sobrang mahal neto considering sobrang nag overbudget din yung project
 

·
Registered
Joined
·
26,297 Posts
^^ As stated by the SPW during the topping [?] off ceremony, DPWH is looking at a toll fee of around P3.50/km [C1]. IIRC, TRB already reviewing proposed toll rates as well [pero wala pa talagang final na nilalabas].

Sa January 2021 naman implementation para HNY hehehe :D
 
  • Like
Reactions: Sky_Higher

·
Registered
Joined
·
1,667 Posts
Villar said in January 2020 "we can expect about ₱4 to ₱5 per kilometer," but there are previous reports that said the toll fee could hit ₱11 per km.
 

·
Registered
Joined
·
26,297 Posts
Hot [email protected] P11/km o_O

Kung 18kms SS3 = P198 C1, dipa kasama upcoming S2E + existing S1/S2...end-to-end from SLEx Alabang to NLEx Balintawak would cost how much you think?
 

·
Premium Member
Joined
·
5,357 Posts

·
Registered
Joined
·
26,297 Posts
S2E SB target completion: July 2021 [mukang madami nga need i-relocate ng poste / high-tension wires sa SB]

Ang said, the completion of the southbound section is scheduled for July next year.
 

·
Premium Member
Joined
·
5,357 Posts

·
Registered
Joined
·
26,297 Posts
^^ Nice meron na sa S5, sana madami magawa today at meh potential super typhoon na possible magpadelay sa asphalt overlay works.

and sana lumihis yung bagyo..or kung pwede tambay lang sha sa mga dams ng mapuno ng tubeg
 

·
Registered Follower
Joined
·
932 Posts
mukhang magtatagpo ang overlay works somewhere near Section 3 or some place. Sana humina yung parating na bagyo pati yung susunod AKA “Pre-Siony”.
 

·
Registered
Joined
·
98 Posts
Yes, but now the route is diverted farther east - hopefully SMC would create an off ramp to Shaw/Kalentong area. Even just one lane (since the area has only 2 lanes in each direction. But given the lack of space in the area, we might have to live with just having the Araneta Ramps at SM centerpoint.
Depende na yan sa SanMig kung gusto nilang gumastos sa pagtayo ng additional ramp. Malaki na din nadagdag sa gastos nila nung mareroute sa San Juan River ang Pandacan to Araneta segment kesa dun sa original via Nagtahan. Kung malaki and projected traffic volume na gagamit nitong ramp pwede siguro ituloy ang ramp.
 