This road is apparently under design. It will cut through Kibera (intersecting with the Southern Bypass), and join Ngong Road as an extension of Ring Road Kilimani.

Does anyone have any further details? Is it going to be dual carriage? Will there be an interchange at Ngong Road, or will this become another jam-infested black spot like the junction of Ring Road Kilimani / Argwings Kodhek Road?
 

·
Registered
Joined
·
14,274 Posts
This road will be very important and will finally clear up and break down the cluster of slums and because roads bring in change an accessibility the people of Kibera will be the biggest benefactors.

Government should start an education campaign so the residents are not brainwashed to stall and fight the project.
 

·
Registered
Joined
·
14,274 Posts
Finally... So are the designs for a dual carriage way?

But will we see an endless court cases?? God forbid and the residents see this road as a sign things are changing.
 

·
Registered
Joined
·
12,675 Posts
The design appears to be a dual carriageway judging from the tender notices
Wondering how come they didn't construct the NHC overpass for this road at the southern by pass with a provision for future expansion into a dual carriage road. No exits or on ramps connecting the overpass to the bypass either.
 

·
Kenyan stakeholder
Joined
·
207 Posts
Yup, dual carriage way, but no over/underpasses save for the railway. Here are some details:

101 Location and Extent of Site
The Project Roads are approximately 3.84 km long and is situated in the City Council of Nairobi. The site of the works shall be within the road reserve and any other places as may be designated in the contract. The works involve upgrading to bitumen standard the section between Ngong road through Kibera, Kungu Karumba to Langata road and strengthening of the existing bituminous lanes and new construction of additional bituminous lanes in order to upgrade the existing 2 lane road (s) to 2x2 lane road(s) at various sections as given in Book of Drawings.
In addition to bituminous construction, the works will include service roads at specific stretches, rehabilitation and widening of existing structures such as bridges, cross drainage works construction of new structures that include flyovers, underpasses, overpasses and bridges.

102 Extent of Contract
The project road under this contract is of approximately 3.84 km. The Rehabilitation and upgrading measures to this section consists of strengthening of the existing 2 lane bituminous road and widening the same to 2x2 lane carriageway with a median separation, service roads, footpaths, drain and street lighting.
The works will also include provision of new grade separators forming overpasses and underpasses at various locations, signalised junctions and a grade separated rail/road junctions.

102.1 Projects Components
The works to be executed under the Contract include the following:
The total length of the section is about 4 km. The schemes proposed in this include:
2 lane 2-way at-grade road with raised central median
2.5 m wide cycle tracks on each side of the road
2.5 m wide footpaths on each side of the road
Road drains under the footpaths and shallow piped drains on the outer side kerbs
Road furniture and markings
Bus bays
Construction of Kibera Railway Underpass
Utility relocation
Safety provisions and protection works
Street lighting
Landscaping
Protection works
 

·
Registered
Joined
·
794 Posts
Yup, dual carriage way, but no over/underpasses save for the railway. Here are some details:

101 Location and Extent of Site
The Project Roads are approximately 3.84 km long and is situated in the City Council of Nairobi. The site of the works shall be within the road reserve and any other places as may be designated in the contract. The works involve upgrading to bitumen standard the section between Ngong road through Kibera, Kungu Karumba to Langata road and strengthening of the existing bituminous lanes and new construction of additional bituminous lanes in order to upgrade the existing 2 lane road (s) to 2x2 lane road(s) at various sections as given in Book of Drawings.
In addition to bituminous construction, the works will include service roads at specific stretches, rehabilitation and widening of existing structures such as bridges, cross drainage works construction of new structures that include flyovers, underpasses, overpasses and bridges.

102 Extent of Contract
The project road under this contract is of approximately 3.84 km. The Rehabilitation and upgrading measures to this section consists of strengthening of the existing 2 lane bituminous road and widening the same to 2x2 lane carriageway with a median separation, service roads, footpaths, drain and street lighting.
The works will also include provision of new grade separators forming overpasses and underpasses at various locations, signalised junctions and a grade separated rail/road junctions.

102.1 Projects Components
The works to be executed under the Contract include the following:
The total length of the section is about 4 km. The schemes proposed in this include:
2 lane 2-way at-grade road with raised central median
2.5 m wide cycle tracks on each side of the road
2.5 m wide footpaths on each side of the road
Road drains under the footpaths and shallow piped drains on the outer side kerbs
Road furniture and markings
Bus bays
Construction of Kibera Railway Underpass
Utility relocation
Safety provisions and protection works
Street lighting
Landscaping
Protection works
Conflicting information. 2x2 at some sections on one hand and 2 lane 2 way on the other
 

·
Registered
Joined
·
794 Posts
I believe both mean the same thing.
2 lane 2 way means that there are 2 lanes going in opposite directions i.e single carriageway like Limuru Road. 4 lane 2 way means that there are 2 lanes in one direction and two in the opposite direction like Valley Road. 6 lane 2 way means 3 in one direction and so forth.

2 lane 1 way means a single road headed in the same direction with 2 lanes like one carriageway of Langata Road. 3 lane 1 way like one carriageway of Mombasa Road etc.

There is also the special case of 3 lane 2 way which is not common in Kenya where 2 lanes go in one direction at certain times and one in the opposite direction and it is opposite that at other times. A probable example is Ngong Road between KNH and Hospital Road where in the morning 2 lanes are there towards town and one lanes towards KNH and the reverse is true in the evening where 2 lanes exist out of town and one lane towards town.
 

·
Mkenya daima
Joined
·
1,910 Posts
2 lane 2 way means that there are 2 lanes going in opposite directions i.e single carriageway like Limuru Road. 4 lane 2 way means that there are 2 lanes in one direction and two in the opposite direction like Valley Road. 6 lane 2 way means 3 in one direction and so forth.

2 lane 1 way means a single road headed in the same direction with 2 lanes like one carriageway of Langata Road. 3 lane 1 way like one carriageway of Mombasa Road etc.

There is also the special case of 3 lane 2 way which is not common in Kenya where 2 lanes go in one direction at certain times and one in the opposite direction and it is opposite that at other times. A probable example is Ngong Road between KNH and Hospital Road where in the morning 2 lanes are there towards town and one lanes towards KNH and the reverse is true in the evening where 2 lanes exist out of town and one lane towards town.
I think in KURA and KeNHA's context 2 lane 2 way means dual carriage... 2X2... Refer to HERE
 