Design is always about form and function, for now we need more of function than form. Looking at the development rate that the country has and is undergoing and the future outlook, the Dar airport is a temporary one; in the next 10yrs we will have no choice but build a new greenfield airport in a new location (there is no expansion room at the current one). So for now lets be happy with function as form has a price tag as well. The money is better invested in upgrading our smaller airport to make, as stated earlier "usafiri wa anga uwe kitu cha kawaida na sio ya matajiri wachache"Wish the Dar one had a unique or fancier exterior like this one..
No mwanza airport wont be like this for the following reasons,Wow is really going to be like this!!??...
Soon there will be direct flights to Oliver Tambo Int. Airport & Dubai (FlyDubai) once the new terminal is complete.Yeah, Visit RwandaAir for nonstop flights from Mwanza.
Also Coastal aviation is no more flying to Jommo Kenyatta, They are currently using Kigali for connecting flights to Oliver Tambo Int. Airport-J'burg:cheers:
Great stuff,
Ndugu Kijian,Dar airport is a temporary one; in the next 10yrs we will have no choice but build a new greenfield airport in a new location (there is no expansion room at the current one).
Sort of confirms it there is a plan for a new location. From satellite photo to be able to expand further the railway line will have to be moved and anyway the city has overtaken the airport. Nchi yetu haina population density ya kulazimu airport kua mjini hivi. In future we will have enough money and traffic to justify a greenfield airport. I predict solid plans within the next 10yrs or before the next president ends his/her second term.Ndugu Kijian,
I humbly beg to differ with your notion that there isn't any room for expansion at JNIA. I believe these slides from the Tanzania Airports Authority [TAA] are self explanatory.
![]()
I thought the current runway capacity was 30 aircraft per hour. Glad to note that this has been increased to 55.
![]()
Kitunda appears to have an open space near the airport's vicinity. Perhaps, it could prove useful in the future. [Image credit: Google Maps]
![]()
Possible runway expansion options.
![]()
TAA has already commenced planning for a new airport at Bagamoyo with an aerodrome reference code of 4F! :| According to ICAO, this implies the aircraft's wing span will be "65m up to but not including 80m".
It is estimated that air craft movement per hour at JNIA will double from 78,000 in 2013 to 154,333 in 2020 making the runway insufficient to accommodate such a growing demand.
In his presentation during the 2014 World Airport Summit held in September, Tanzania Airport Authority (TAA) chief executive officer Suleiman Suleiman said such forecast air traffic suggested the present runway would not provide sufficient capacity beyond 2020.
Source: Dar ‘4th worst airport’ in Africa, The Citizen http://www.thecitizen.co.tz/Busines...frica/-/1840414/2564692/-/qvxer1/-/index.html
Source: Setting Pace for Improved Air Services in Mwanza by Ester Mwakyusa, Daily News http://www.dailynews.co.tz/index.php/features/40226-setting-pace-for-improved-air-services-in-mwanzaSummary:
- Runway to be extended to 3.8 km - it will be the longest in the country; followed by KIA (3.6 km), Songwe (3.33 km), JNIA and AAKIA (both 3.0 km)
- Phase I includes the extension of the runway by 500m, a cargo terminal, air control tower, taxiways and cargo apron, a car park, new terminal building for passengers, turning loops, connecting roads, taxiways, aviation fuel farm and drainage system.
- Phase II entails the construction of a parallel taxiway, strengthening of runway shoulders, construction of security fence, building a cold storage facility, a hotel, maintenance hangar and more connecting roads.
- At present, the terminal building has three lounges: Departures, Arrivals and VIP; and has a capacity for 200 pax at any given time. Annual throughput capacity 0.5 million pax. (It served 439,128 pax in 2013).
- The airport has been operating 24/7 since 17 July 2011
- The road from the CBD to the airport will be expanded to four lanes.
Hivi Termnial builidng Construction imeanza,au itaanza lini?Cargo building concret foundation commenced late december 2014, from a distance, i saw some emrging pillars. Will come up with the ground photos and share
Mara ya mwisho nilipotembelea site na kuongea na mmoja wa Chinese alisema kuwa kwenye ile render awali kuna mabadiliko. Mpaka sasa sijapata jibu la uhakika ni mchoro gani utatumika. Ila jambo ambalo wameconsetrate nalo kwanza ni Control tower ambayo wanamalizia na sasa wanaanza kushuka toka kilimani hadi huku chini kwenye site ya jengo la mizigo baada ya hapo Terminal building.Hivi Termnial builidng Construction imeanza,au itaanza lini?
Yes I understand Pinda mentioned that the original design was Changed to make it as large as Dar Terminal 3.Mara ya mwisho nilipotembelea site na kuongea na mmoja wa Chinese alisema kuwa kwenye ile render awali kuna mabadiliko. Mpaka sasa sijapata jibu la uhakika ni mchoro gani utatumika. Ila jambo ambalo wameconsetrate nalo kwanza ni Control tower ambayo wanamalizia na sasa wanaanza kushuka toka kilimani hadi huku chini kwenye site ya jengo la mizigo baada ya hapo Terminal building.
![]()
not quite sure, but someone posted this in his fb page with explanations MWANZA AIRPORT DESIGN, he did the post on 5th feb 2015.