After much delay, ORR opens today

The much-delay- ed widening of the 41.535-km Outer Ring Road (ORR), is complete and ready for vehicular movement.

Chief Minister Siddaramaiah will inaugurate the motorway between 0 kilometre to 34.045 km on Thursday.

Addressing reporters, here, on Wednesday, at Mysuru Urban Development Authority (MUDA) Chairman K R Mohan Kumar said, the road upgradation works that were taken up under Jawaharlal Nehru National Urban Renewal Mission (JnNURM), 12 years ago, were finally completed.

The work on upgrading the ORR to six-lane had been taken up under four different packages, considering the rising vehicular traffic.

The project will meet the projected vehicular movement till 2030. The 7.49-km stretch between Bengaluru Road to Bannur junction which was taken up under package IV was opened in August 2012, Kumar added.

He said, the 41-km stretch was completed with basic facilities like streetlights and other facilities.

He said, 1,270 electricity poles with streetlights were put up on the stretch.

Maintenance

When asked about the maintenance of the road, he said, initially the MUDA would maintain the ORR and the authorities would discuss with the minister concerned about further maintenance.

Siddaramaiah will inaugurate the road in the presence of Union Minister for Urban Development M Venkaiah Naidu.

Urban Development Minister Vinay Kumar Sorake, PWD Minister Dr H C Mahadevappa, Rural Development Minister H K Patil, Social Welfare Minister H Anjaneya, Cooperation Minister H S Mahadev Prasad, and Mayor B L Bhyrappa.

http://www.deccanherald.com/content/543154/after-much-delay-orr-opens.html
 

·
******
Joined
·
10,453 Posts
CM to set ball rolling for grade separator project

Grade separators on the congested Outer Ring Road will be a reality by next year. Chief minister Siddaramaiah will lay the foundation stone for the project on Thursday, following which the work will begin.


The proposed separators will come up at three junctions - ORR-Hunsur Road, ORR-Bengaluru-Mysuru road and near JSS College on Mysuru-Nanjangud road. Though eight proposals were submitted by the Mysuru Urban Development Authority (Muda), four were cleared. For starters, work will be taken up on three of them.


The project is estimated to cost Rs 77.26 crore, of which Rs 14.99 crore has been released in the first phase; the project is expected to be completed by October 2017. However, work will not begin on the grade separator proposed near KRS Road owing to technical problems, said Muda chairman K R Mohan Kumar.


Though Outer Ring Road is operational, Siddaramaiah will inaugurate it officially. "ORR was envisioned to divert traffic and entry of heavy motor vehicles to minimize congestion within the city. It spans 42km and was built under the Centre's JNNURM scheme at an estimated cost of Rs 252 crore. In the first phase and package 4 (Bengaluru road to Bannur road) a 7.49 km stretch was constructed in 2012, the remaining 34.045km stretch was completed two months ago," said Kumar. As of now, Muda is maintaining the road but once it is formally opened, the authority will the approach the government to know who will be in-charge of its upkeep in the days to come.


Inauguration of bhavans: On the same day, the CM will inaugurate Babu Jagajivan Ram Bhavan constructed at a cost of Rs 4.5 crore near Paduvarahalli and Maharshi Valmiki Bhavan built at a cost of Rs 4.92 crore.

http://timesofindia.indiatimes.com/...de-separator-project/articleshow/52021439.cms
 

·
0821- City of Palaces!
Joined
·
35,181 Posts
Discussion Starter · #2,091 ·
POLICE POLICE/2016-17/IND1104 Supply Installation and Commissioning of Traffic signal system Solarized at 3 locations along Outer Ring Road Mysore OPEN GOODS ---- 02/05/2016 17:25:55 31/05/2016 17:00:00
 
2081 - 2100 of 2127 Posts
Top