Skyscraper City Forum banner
1 - 1 of 1 Posts

·
Banned
Joined
·
148 Posts
Discussion Starter · #1 ·
Located in the Karas region along the Fish River in the south of the country, the project is the first phase of the Neckartal Irrigation Scheme. Made from roller-compacted concrete (RCC) and standing around 80 metres high, the Neckartal dam will harness water from the Fish River to produce energy and to create a reservoir capable of holding 857 million cubic metres of water, which will be used to irrigate 5,000 hectares of land for the agricultural development of the area.

http://constructionreviewonline.com/2014/05/28/neckartal-dam-project-namibia/
 
1 - 1 of 1 Posts
Top