The massive Mercedes showroom near the entrance to the Lincoln Tunnel is not long for this world. A tipster sent a picture of the brutish building .. in the midsts of its demolition.
So this tower is already close to be U/C?As reported by curbed: :banana: Yimby also has more details.
This tower won't offer luxury apartments, hence the low ceiling. You can't compare this project to the 57th street supertalls, where several 400m+ towers to the roof have a low floor count.How can 106 floors fit into a 335m tall building? :nuts: That sounds weird to me.
Nice news for this buildingSo this tower is already close to be U/C?
I think it's a Bauer driller. Piling is coming soon!Isn't that a pile driver? we just need visual confirmation that it's working and this tower can be considered U/C!
When this tower will be finished ?Technically, is Prep.
IMO not quite yet, to the east of the property there are still about 4 floors to be demolished and on the west side it seems that the machinery is still working on removing debris rather than pilling or digging.Demo looks done. Perhaps the title should be changed to "Prep".