2,100 Posts
Will these guys ever finish building this railway or did they came to Ethiopia for holidays? Apart from taking selfies, do they actually work as well? :lol:
You can't really blame the Turks for the delays. The project was divided into two phases to begin with because the Ethiopian govt couldn't secure the entire loan, they only got the loan for phase 1. They then had to wait until phase 2 loans were secured. And once they were done with phase 1, the Ethio government couldn't get its act together to connect the train line to the national electric grid, so Yapi have been sitting with a finished project on their hands for over a year now (or maybe 2). One more mismanaged project in Ethiopia :eek:hno:
 

·
Registered
Joined
·
2,109 Posts
Have anyone seen this video before?
 

·
Registered
Joined
·
2,100 Posts
ለአዋሽ ወልዲያ ሀራ ገበያ የባቡር ፕሮጀክት የከፍተኛ ኃይል ማስተላለፊያ መስመር ለመገንባት ስምምነት ተፈረመ
Jun 19, 2020
አዲስ አበባ ፣ ሰኔ 12 ፣ 2012 (ኤፍ ቢ ሲ) ለአዋሽ – ወልዲያ ሀራ ገበያ የባቡር ፕሮጀክት የኃይል አቅርቦት የሚያገለግል የከፍተኛ ኤሌክትሪክ ኃይል ማስተላለፊያ መስመር ግንባታ ስራ ለማከናወን የሚያስችል ስምምነት ተፈረመ፡፡
ስምምነቱ ለባቡር ፕሮጀክቱ የኤሌክትሪክ ኃይል ለማቅረብ የሚያስችል ባለ 230/132 ኪሎ ቮልት ከፍተኛ ኤሌክትሪክ ኃይል ማስተላለፊያ መስመር ነው።
ስምምነቱን የኢትዮጵያ ኤሌክትሪክ ኃይል ዋና ሥራ አስፈፃሚ አቶ አሸብር ባልቻ እና የቻይናው ፒንጋኦ ግሩፕ ኦቨርሲስ ማርኬቲንግ ዳይሬክተር ዣይ ያንቢን ተፈራርመዋል፡፡
የባቡር ፕሮጀክቱ ካለው ሃገራዊ ጠቀሜታ አኳያ የፕሮጀክቱ ግንባታ ስራ በተያዘለት የጊዜ መርሃ ግብር ጥራቱን ጠብቆ መጠናቀቅ እንዳለበት ዋና ስራ አስፈፃሚው አሳስበዋል፡፡
ለፕሮጀክቱ ግንባታ የመስመር ዝርጋታውን ለማጠናቀቅ ብቻ 11 ነጥብ 5 ሚሊየን የአሜሪካ ዶላር ተመድቧል፡፡
መንግስት የተጀመሩ ግዙፍ ፕሮጀክቶችን ለማጠናቀቅ በሰጠው ትኩረት መሰረት የፕሮጀክቱ አጠቃላይ ወጪ በኢትዮጵያ መንግስት እንዲሸፈን መደረጉን ዋና ስራ አስፈፃሚው ተናግረዋል፡፡
የቻይናው ፒንጋኦ ግሩፕ ኦቨርሲስ ማርኬቲንግ ዳይሬክተር ዣይ በበኩላቸው የፕሮጀክቱን አስፈላጊነት ስለተገነዘብን ፕሮጀክቱን በተያዘለት የጊዜ ገደብ ጥራቱን ጠብቆ እንዲጠናቀቅ በትኩረት እንሰራለን ብለዋል፡፡
206 ኪሎ ሜትር ርዝመት የሚኖረው የፕሮጀክቱ አጠቃላይ ግንባታ በ12 ወራት ውስጥ ይጠናቀቃል ተብሎ ይጠበቃል።

የአዋሽ – ወልዲያ ሀራ ገበያ የባቡር ፕሮጀክት የግንባታ ስራ ተጠናቆ የኃይል አቅርቦት በመጠባበቅ ላይ እንደሚገኝ ከኢትዮጵያ ኤሌክትሪክ ሃይል ያገኘነው መረጃ ያመላክታል ፡፡

 