Kawasaki and Marubeni to upgrade Fergana's power plant




Tashkent held a solemn ceremony to mark the start of construction two high-capacity combined cycle power units at Fergana’s Thermal Power Plant and biler house РК-3.

The ceremony was attended by public officials, Uzbekenergo, Japan’s NEDO, Kawasaki Heavy Industry, Marubeni Utility Services, and media.

In 2016 Uzbekistan and Japan signed a memorandum of understanding, as well as an agreement between Uzbekenergo on the one hand and Kawasaki Heavy Industries and Marubeni Utility Services on the other.

The project is realised under the Presidential Resolution no.ПП-2794.

The project will help produce a further 197.24m kWh in electricity and 214,500 Gcal of heat energy.

The project is financed by Uzbekenergo and the New Energy and Industrial Technology Development Organisation.

The project will help create additional electricity sources with a total output of 24 MW, while supplying stable and reliable electricity.

http://news.uzreport.uz/news_4_e_151607.html
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #62 ·
State and prospects of oil and gas industry discussed in Tashkent




On June 14, the International Press Club (IPC) saw a regular session, which discussed the state and prospects of the oil and gas industry of Uzbekistan, as well as new projects in the petrochemical industry with foreign partners.

Chairman of the Board of NHC "Uzbekneftegaz" Alisher Sultanov, First Deputy Chairman of Uzbekneftegaz Ulugbek Sayidov, Deputy Chairman of the Board of NHC "Uzbekneftegaz" Olimjon Rustamov and Director of "Neftegazinvest" Sidiqov Bahodir were among the speakers. Representatives of structural subdivisions of the «Uzbekneftegaz», international and national companies, experts, as well as foreign media attended the meeting.

The oil and gas industry of independent Uzbekistan who turned 25 years old, is the flagship of the industry and leading sector of the economy that plays an important role in the socio-economic development of the country.

Structural transformation and large-scale investment projects have allowed Uzbekneftegaz to increase production of marketable products that meet the needs of the population, industry, transport and housing and communal services.

The adoption of the Decree of the first President of the Republic of Uzbekistan Islam Karimov on the creation of a single complex, bringing together disparate enterprises for extraction, processing and transportation of gas, oil refining and production of petroleum products marked a new history of the development of the oil and gas industry.

According to experts, a third of all mineral reserves of Central Asia are focused in Uzbekistan, while in terms of gas-production the country ranks eighth in the world.

During the years of independence, the country has done a great job on the reconstruction of existing facilities, the construction of new plants, systems and facilities, booster compressor stations, underground gas storage facilities.

Companies within the National holding company Uzbekneftegaz carried out a large-scale exploration, exploratory and production drilling of oil and gas wells, developing oil and gas fields, extraction of oil, gas and gas condensate and their processing.

NHC "Uzbekneftegaz", with more than 128 thousand specialists, is a vertically integrated, three-tier structure, which includes more than 200 companies.

Oil and gas development was facilitated by the combination of a rich resource base, technological capacity and the interest of foreign companies in cooperation. Among all foreign investment resources in Uzbekistan, a large part is channelled towards the development of oil and gas industry.

The last two decades have become significant for the NHC "Uzbekneftegaz". Major foreign investments began to flow since the early 2000-ies. Some $30.7 billion were utilised in the framework of the implementation of investment projects for 1991-2016.

The program of measures on structural reforms, modernization and diversification of production for 2015-2019 provides for the implementation of 54 investment projects worth over $18 billion.

The share of NHC "Uzbekneftegaz" in the formation of the gross domestic product of the country comprises almost a fifth of industrial production – about 15%, while in the budget – more than 20%.

Active cooperation with foreign partners and increasing inflow of foreign direct investment contributed to the fact that the oil and gas sector has become the "locomotive" of economic growth of Uzbekistan.

The implementation of major multinational project for the construction of the gas pipeline "Turkmenistan–Uzbekistan–Kazakhstan–China" provides export and transit of natural gas. The length of the Uzbek part of the pipeline is 529,7 km and its capacity is 50 billion cubic meters of gas per year.

Shurtan and Ustyurt gas-chemical complexes have become the basis for the creation of a new field of gas chemistry. Today, these complexes produce over 500 thousand tons of polyethene, 83 thousand tons of polypropylene.

The oil and gas industry of Uzbekistan is successfully implementing projects for deeper processing of hydrocarbons and producing new kinds of products, focusing on trends at the global level.

Sustainable growth, accompanied by integration in the world markets, became the basis for a new round of development of the domestic complex.

http://economics.uzreport.uz/news_e_153339.html
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #63 ·
Kandym Gas Processing Complex commissioned







The opening ceremony of the complex took place on 19 April. President of the Republic of Uzbekistan Shavkat Mirziyoyev took part in it.

Shavkat Mirziyoyev initiated the construction of Kandym gas processing complex in Bukhara region exactly two years ago, on April 19, 2016. Since then, a large industrial complex and a small town have been built here.

The opening ceremony of the complex took place on 19 April. President of the Republic of Uzbekistan Shavkat Mirziyoyev took part in it.

The head of our state noted that the work carried out within the framework of the action strategy serves the consistent development of the leading sectors.

Active attraction of foreign direct investments into the fuel and energy complex and Kandym gas processing complex is another bright embodiment of cooperation between Uzbekistan and Russia. The President thanked the engineers and builders and wished success to the staff of the enterprise.

The congratulatory message of the President of the Russian Federation, Vladimir Putin was read by the Minister of energy of this country, Alexander Novak.

The complex will process 8.1 billion cubic meters of gas per year, which will allow producing purified gas, gas condensate, sulfur and other products. Over 2 thousand people will be employed.

This large-scale project worth more than $ 3 billion was implemented within the cooperation of the national holding company Uzbekneftegaz and the Russian company LUKOIL. 114 wells were equipped, gas collection and processing system was built. Complex technical solutions and advanced technologies were applied. Roads, terminals, main gas pipeline, electricity, water supply networks and other infrastructure facilities were built.
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #64 ·
Узбекистан намерен построить новый газохимический комплекс



Узбекистан в ближайшие годы намерен построить новый газохимический комплекс (ГХК), который станет основой крупнейшего в регионе технологического кластера, сообщает корреспондент Podrobno.


«В настоящее время “Узбекнефтегаз” совместно с иностранными партнерами начал проработку проекта по созданию технологического кластера путем строительства современного газохимического комплекса и развития на его базе смежных отраслей промышленности, направленных на производство продукции с высокой добавленной стоимостью», — отметил первый заместитель председателя правления «Узбекнефтегаз» Улугбек Сайидов.

По его словам, в рамках технологического кластера предусматривается строительство ГХК с объёмом переработки 1,3−1,5 миллиарда кубометров газа на базе технологии МТО (метанол в олефины) и производством 200−250 тысяч тонн полипропилена, 100 тысяч тонн этиленпропиленового каучука, 100 тысяч тонн полиэтилентерефталата и этиленвинилацетата, 100−150 тысяч тонн этиленгликоля и полиэтилена.
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #65 ·
Uzbekistan to build nuclear power plant in accordance with IAEA recommendations



The Uzbek side informed the participants of the general conference about the signing of the intergovernmental agreement between Uzbekistan and Russia on cooperation in the construction of the first nuclear power plant in our country, as well as the beginning of the relevant work in this direction, the preparation of the program for the development of nuclear energy for peaceful purposes and personnel for the industry.

The delegation of the Republic of Uzbekistan headed by the President of the Academy of Sciences Behzod Yuldashev attends the annual 62nd session of the General conference of the International Atomic Energy Agency (IAEA), which is underway on September 17-21 in Vienna (Austria).

On the first day of the plenary session, President of the Academy of Sciences of Uzbekistan addressed with a national report. In his speech, he noted the importance of cooperation with the IAEA, including the implementation of projects within the framework of technical assistance.

Since the establishment of cooperation with the IAEA, the 25th anniversary of which will be celebrated in 2019, Uzbekistan, together with the IAEA, has done a huge work to improve the radiation and nuclear safety of the country and the region. A Central Asian Nuclear-Weapon-Free-Zone Treaty was signed on the initiative of our Republic.

The Uzbek side informed the participants of the general conference about the signing of the intergovernmental agreement between Uzbekistan and Russia on cooperation in the construction of the first nuclear power plant in our country, as well as the beginning of the relevant work in this direction, the preparation of the program for the development of nuclear energy for peaceful purposes and personnel for the industry.

The head of the delegation on behalf of the Republic of Uzbekistan assured that the project will be implemented in strict accordance with the IAEA recommendations and compliance with international norms and rules in this area, and expressed hope for mutually beneficial cooperation and support of the IAEA in this direction.

https://uzreport.news/economy/uzbekistan-to-build-nuclear-power-plant-in-accordance-with-iaea-recommendations
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #66 ·
В Узбекистане показали проект будущей АЭС



В Ташкенте продемонстрировали проект будущей АЭС, которая будет построена в ближайшие годы в республике, сообщает корреспондент Sputnik Узбекистан.

Макет продемонстрировали в рамках проводимой в узбекской столице 9—11 октября совместного семинара для специалистов Узбекистана Госкорпорации «Росатом» и миссии Международного агентства атомной энергетики (МАГАТЭ).

В начале сентября глава российского кабмина Дмитрий Медведев и глава правительства Узбекистана Абдулла Арипов подписали соглашение о сотрудничестве в строительстве на территории республики АЭС. «Росатом» планирует построить комплекс из двух энергоблоков поколения «3 +» с реакторными установками ВВЭР-1200.

Для строительства АЭС предложена площадка в районе озера Тудакуль на границе Бухарской и Навоийской областей республики.

По предварительным расчетам, АЭС будет вырабатывать до 20% действующих сегодня генерирующих мощностей в Узбекистане.

Ранее президент Узбекистана Шавкат Мирзиёев на заседании правительства назвал строительство АЭС в стране революционным решением, для реализации которого потребуется 8−10 лет.
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #67 ·
Узбекистан и Gazprom International подписали СРП по месторождению Джел



Узбекистан и Gazprom International подписали соглашение о разделе продукции в отношении месторождения Джел.

Компания Gazprom International и Узбекистан заключили соглашение о разделе продукции (СРП) по проекту разработки месторождения Джел в Каракалпакстане, сообщила пресс-служба «Узбекнефтегаза».

Срок действия соглашения — 25 лет. «В рамках проекта планируется получение прибыли Республикой Узбекистан от участия в СРП, создание новых рабочих мест, вклад в развитие минерально-сырьевой базы и дальнейшее геологическое изучение месторождений Устюртского региона, развитие технологий, основанных на лучших мировых практиках в нефтегазовой отрасли, обмен передовым опытом, обучение и стажировка специалистов», — отмечают в «Узбекнефтегазе».

Месторождение Джел было открыто в пределах Шахпахтинского инвестиционного блока в 2009 году. Оно расположено на плато Устюрт в Кунградском районе Каракалпакстана. Запасы месторождения составляют 6,4 млрд кубометров газа и 76 тысяч тонн газового конденсата.

В 2002 году «Газпром» и «Узбекнефтегаз» подписали соглашение о стратегическом сотрудничестве, предусматривающее участие «Газпрома» в проектах добычи природного газа на территории Узбекистана на условиях соглашения о разделе продукции. С 2004 года «Газпром» на условиях СРП участвует в восстановлении добычи газа на месторождении Шахпахты.
 

·
Гузель Т
Joined
·
147 Posts
Russia to build two-reactor nuclear plant in Uzbekistan


Russian President Vladimir Putin and the president of Uzbekistan have agreed that Russia will build the ex-Soviet republic’s first nuclear power plant.

During Putin’s visit to the Uzbek capital of Tashkent on Friday, he and President Shavkat Mirziyoyev ordered the start of preliminary work at the future plant’s construction site.

The plant in the Navoi region of central Uzbekistan is estimated to have a cost $11 billion. It will have two 1,200-megawatt nuclear reactors and is set to begin operating in 2028.

Putin says Moscow is ready to expand military technology ties with the government in Tashkent, including the possible joint production of weapons in Uzbekistan.

Mirziyoyev says Russian and Uzbek companies also could expand their cooperation in textile industries and fertilizer production and sell the products internationally.

http://www.tribtown.com/2018/10/19/eu-russia-uzbekistan/
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #69 ·
На Тахиаташскую ТЭС прибыли газовые турбины и генераторы GE



GE завершила первую поставку основного энергетического оборудования для модернизации Тахиаташской ТЭС в Узбекистане.

Компания General Electric завершила поставку первой партии оборудования для модернизации Тахиаташской теплоэлектростанции, сообщили «Газете.uz» представители GE.

Поставка включает в себя две газовые турбины и два генератора для новых блоков, строящихся в рамках модернизации. Этот проект реализуется GE и южнокорейским консорциумом в составе Hyundai Engineering и Hyundai Engineering and Construction.

Оборудование было доставлено в порт Влиссинген (Нидерланды), оттуда перевезено через Средиземное, Черное и Азовское море, затем через Волго-Донский канал в Каспийское море до порта Курык в Казахстане и далее грузовым автотранспортом до стройплощадки в Узбекистане.

Проектом предусмотрено строительство двух парогазовых установок (ПГУ) суммарной мощностью 580 МВт. Запуск первой очереди ПГУ запланирован на 2020 год.

В рамках модернизации, как ожидается, GE поставит два комплекта основного оборудования, состоящих каждый из газотурбинной установки GT13E2, паровой турбины и генератора. Кроме того, компания предоставит конечному заказчику длительную заводскую гарантию на оборудование, окажет консультационные услуги во время его монтажа и проведет обучающие тренинги для персонала станции.

Основа ПГУ Тахиаташской ТЭС — газовая турбина GT13E2 — имеет КПД в комбинированном цикле свыше 55%. Они работают на Минской ТЭЦ-3 в Беларуси, на Разданской и Ереванской ТЭЦ в Армении, а также на Новогорьковской, Академической ТЭЦ и Нижнетуринской ГРЭС в России.

Комплексная поставка оборудования на Тахиаташскую ТЭС — уже второй крупный проект GE в рамках модернизации энергетического сектора Узбекистана. В конце 2017 года на Ташкентской ТЭС был торжественно введен в эксплуатацию новый парогазовый блок мощностью 370 МВт на основе оборудования GE.

На сегодняшний день установленная мощность Тахиаташской ГРЭС — 730 МВт. Первый энергоблок был введен в эксплуатацию в 1956 году, последний (пятый) — в 1990 году.

https://www.gazeta.uz/ru/2018/11/13/ge/
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #70 ·
30 investment projects worth $36.5 billion to be implemented in oil and gas sector by 2030



During this period, the refineries produced an additional 204,000 tons of oil products, having satisfied the domestic market demand for gasoline and diesel fuel.

President Shavkat Mirziyoyev chaired a meeting devoted to the state of affairs in the oil and gas industry.

Over the past two years, gas production increased by 10 percent, natural gas supplies to the population increased by 15 percent, liquefied gas – by 1.6 times.

During this period, the refineries produced an additional 204,000 tons of oil products, having satisfied the domestic market demand for gasoline and diesel fuel.

Until 2030 it is planned to implement 30 investment projects worth $36.5 billion in exploration, production and deep processing of hydrocarbons.

https://uzreport.news/economy/30-investment-projects-worth-365-billion-to-be-implemented-in-oil-and-gas-sector-by-2030
 

·
Гузель Т
Joined
·
147 Posts
https://eng.belta.by/society/view/u...er-plant-construction-experience-116986-2018/

Uzbekistan looks into Belarusian nuclear power plant construction experience

MINSK, 29 November (BelTA) – Uzbekistan studies the experience of construction of the Belarusian nuclear power plant, the press service of the Belarusian Energy Ministry told BelTA. Belarusian Deputy Energy Minister Mikhail Mikhadyuk met with a delegation of the Nuclear Energy Development Agency under the Cabinet of Ministers of Uzbekistan in Minsk on 29 November. Representatives of the Uzbek agency and the contractor company ENTER Engineering were made familiar with the Belarusian experience of building the nuclear power plant, scientific support for the national nuclear energy program, and participation of enterprises accountable to the Energy Ministry in the construction project. The sides exchanged signed copies of the memorandums of understanding on cooperation in peaceful uses of nuclear energy between the Belarusian Energy Ministry and the Nuclear Energy Development Agency under the Cabinet of Ministers of Uzbekistan.
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #72 ·
По итогам 2024 года АО «Узбекгидроэнерго» планирует осуществить реализацию 4 ГЭС мощностью более 30МВт, 16 новых малых, и провести модернизацию 21 действующих ГЭС. Об этом говорится в Концепции развития гидроэнергетической отрасли Республики Узбекистан на 2020−2024 годы.



До 2025 года Узбекистан планирует направит $2,63 млрд. на реализацию этих проектов, из них — $2,04 млрд. собственные средства и $643 млн. — кредитные средства.

В документе отмечается, что электроэнергетика является базовой отраслью, определяющей развитие экономики страны. Потребность в электроэнергии промышленности и населения Узбекистана определяется уровнем развития культуры гражданского общества, энергоэффективностью и энергосбережением единой энергетической системы. Эти факторы взаимосвязаны и совместно формируют возможные сценарии социально-экономического развития республики.

Выработка электроэнергии в Узбекистане менее диверсифицирована и в основном используется природный газ. Более 80% установленной электрической мощности в Узбекистане обеспечивается природным газом, за ней следуют гидроэнергетика — более 10%, и уголь — 5%.
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #73 ·
Шавкат Мирзиёев поручил ускорить строительство завода GTL







Президент поручил ускорить строительство завода GTL в Кашкадарье. Когда комплекс начнет производить топливо, люди почувствуют снижение себестоимости бензина, сказал он.

Президент Узбекистана Шавкат Мирзиёев в ходе поездки по Кашкадарье в четверг ознакомился с ходом строительства в Шуртане (Гузарский район) завода по производству синтетического топлива из природного газа (технология gas-to-liquid — GTL).

Как сообщила пресс-служба главы государства, работы ведутся на площади более 135 га — заложен фундамент, установлены железобетонные опоры, начата сборка сложных конструкций.

Завод возводится по технологиям лицензиаров — Sasol (ЮАР), Haldor Topsoe (Дания) и Chevron (США). Главные подрядчики — Hyundai Engineering и Hyundai Engineering and Construction (Южная Корея), а также Enter Engineering (Сингапур).

Необходимое для комплекса технологическое оборудование — более 11 тысяч единиц — изготавливается на 126 заводах 21 страны, включая Японию, Южную Корею, Сингапур, США, Германию, Италию, Китай и Россию.

Комплекс в Шуртане станет шестым таким заводом в мире. Стоимость проекта составляет 3,6 млрд долларов. После запуска здесь будет налажена глубокая переработка 3,6 млрд кубометров газа, производство 1,5 млн тонн синтетического жидкого топлива стандарта «Евро-5», в том числе 311 тысяч тонн авиакеросина, 743 тысяч тонн дизельного топлива, 431 тысячи тонн нафты и 53 тысяч тонн сжиженного газа.

Ожидается, что продукция завода позволит экономить более 1 млрд долларов, направляемых на закупку нефти за рубежом. «Когда начнется производство топлива и снизится себестоимость бензина, люди обязательно это почувствуют», — сказал Шавкат Мирзиёев.

Президент отметил, что необходимо ускорить запуск завода, максимально задействовав специалистов, технику и ресурсы, и как можно раньше начать выпуск продукции.

После ввода завода работой будут обеспечены более 1300 человек.

https://www.gazeta.uz/ru/2018/12/13/gtl/
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #74 ·
Узбекистан начнет строительство АЭС не ранее 2022 года



Узбекистан, Ташкент — АН Podrobno.uz. Узбекистан начнет строительство атомной электростанции не ранее 2022 года, сообщает корреспондент Podrobno.uz со ссылкой на Концепцию атомной энергетики до 2029 года, утвержденную в четверг главой государства.

Согласно документу, возведение первой в стране атомной электростанции будет разделено на три этапа.

В ходе первого в 2019—2020 годах будет определено место строительства АЭС, в 2020—2021 годах — планируется разработать технико-экономическое обоснование проекта и с 2022 года приступит к строительству объекта.

Планируется, что после запуска двух энергоблоков мощностью 2,4 ГВт, станция будет ежегодно вырабатывать 18,9 миллиардов кВт/ч, будет создано 2700 рабочих мест, в том числе свыше 1900 на самой станции.

Финансироваться проект будет за счет собственных средств Узбекистана и государственного кредита России. С «Росатомом», выступающим главным подрядчиком проекта, будет заключен EPC-контракт (engineering, procurement and construction).

Напомним, что АЭС будет состоять из двух энергоблоков ВВЭР-1200 поколения «3+» мощностью 1200 МВт каждый, которые отвечают всем требованиям по безопасности Международного агентства по атомной энергии. После ее ввода Узбекистан сможет снизить выбросы углекислого газа в атмосферу до 14 миллионов тонн и оксидов азота на 36 тысяч тонн.

Сдача первого в эксплуатацию запланирована до 2028 года.

В результате запуска станции Узбекистан будет ежегодно экономить 3,7 миллиарда кубометров природного газа. Даже если экспортировать сэкономленный газ без его переработки, в Узбекистан будет поступать 550−600 миллионов долларов в год.

https://news.mail.ru/economics/36249218/?frommail=1
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #75 ·
Международный консорциум инвестирует $5,2 млрд в разработку нефти и газа



Международный консорциум в 2019—2023 годах инвестирует $5,2 млрд в разработку нефти и газа в Узбекистане.

Международный консорциум в составе американской Epsilon Development Company и Epsilon Asia Limited (Гонконг) в 2019—2023 годах инвестирует 5,2 млрд долларов в разработку месторождений нефти и газа в Узбекистане, сообщил корреспонденту «Газеты.uz» представитель пресс-службы Epsilon Development Company, оператора проектов в республике Сардор Исхаков.

«Для реализации проектов в Узбекистане создан консорциум инвесторов в составе Epsilon Development Company и Epsilon Asia Limited, который осуществит разработку месторождений нефти и газа в стране», — сказал Сардор Исхаков. Он уточнил, что консорциум получил лицензии на поиск, разведку, добычу и транспортировку углеводородов на пяти инвестиционных блоках в Бухаро-Хивинском и Ферганском нефтегазовых регионах республики.

Представитель компании также сообщил, что финансирование проекта будет осуществляться на основе соглашения о государственно-частном партнерстве за счет привлечения прямых инвестиций участников консорциума и кредитов зарубежных банков, привлекаемых без государственных гарантий.

По предварительным оценкам оператора, прирост запасов газа на лицензионных площадях за пять лет может составить около 500 миллиардов кубометров газа (по категории C1), 12 миллионов тонн газового конденсата (C1) и 8,6 миллиона тонн нефти (C1+C2).

«В марте мы уже получили приток газа с двух скважин на одном из месторождений в Бухаро-Хивинском регионе с дебетом 200 и 250 тысяч кубометров в сутки соответственно», — уточнил представитель Сардор Исхаков.

По данным Epsilon Development Company, на первоначальном этапе весь объем добываемых углеводородов будет реализовываться на внутреннем рынке Узбекистана. По окончании геолого-разведочных работ и утверждении запасов, по каждому месторождению будет подготовлена программа разработки и обустройства месторождений, выбран оптимальный вариант их разработки.

«Далее будет принято решение о целесообразности строительства серо-газоперерабатывающего завода», — добавил представитель Epsilon Development Company.

https://www.gazeta.uz/ru/2019/03/19/epsilon-dev/
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #76 ·
Узбекистан переведет кирпичные заводы с газа на альтернативное топливо



Промышленные предприятия республики хотят перевести на уголь, древесные брикеты и биогаз.

Узбекистан планирует перевести заводы по производству кирпича и цемента, цеха по изготовлению извести, котельное оборудование предприятий и тепличных хозяйств на использование альтернативных видов топлива, говорится в проекте постановления правительства.

В документе уточняется, что «энергоемкость отечественной экономики остается высокой, уровень диверсификации потребляемых топливно-энергетических ресурсов не отвечает мировым тенденциям вовлечения в промышленное производство возобновляемых источников энергии, в структуре потребления первичных видов топлива доминирует доля природного газа».

«На местах не должным образом организованы работы по переводу технологий заводов на использование альтернативных видов топлива. При этом расчетами подтверждается, что перевод на уголь заводов по производству кирпича позволяет высвободить природный газ в объеме около 1,5 миллиарда кубометров, а цехов по изготовлению извести — 668 миллионов кубометров», — отмечается в постановлении.

Для изменения ситуации эти объекты планируется перевести с газа на использование других альтернативных видов топлива — угля, угольных и древесных брикетов и паллетов, биогаза и других.

Специальная комиссия до 1 июня 2019 года осуществит инвентаризацию и сформирует список объектов, подлежащих переоборудованию на использование альтернативных видов топлива.

Кроме этого, до конца года в республике закроют предприятия, использующие энергетически неэффективное и энергоемкое котельное оборудование.

Также с 1 января 2020 года «Узнефтегазинспекция», «Узэнергоинспекция», «Узтрансгаз» прекратят поставку природного газа предприятиям, которые не переоборудуют объекты на использование альтернативных видов топлива.

https://news.mail.ru/economics/36805818/?frommail=1
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #77 ·
На модернизацию Бухарского НПЗ направят $553 млн



Бухарский нефтеперерабатывающий завод впервые за 22 года будет модернизирован. Для этого направят 553 млн долларов. После завершения работ завод сможет перерабатывать 2,5 млн тонн нефти и газового конденсата.

В 2020 году на Бухарском нефтеперерабатывающем заводе начнется проект по модернизации объекта на сумму 553 млн долларов. Об этом говорилось в спецпрограмме телеканала «Узбекистан 24», посвященной визиту президента Шавката Мирзиёева в Бухарскую область 29−30 марта.

Завод, основанный в 1997 году, будет впервые технологически обновлен. После завершения работ НПЗ сможет ежегодно перерабатывать 2,5 млн тонн нефти и газового конденсата, за счет чего будет налажено производство 1,2 млн тонн бензина стандарта «Евро-5», 200 тысяч тонн авиакеросина, 750 тысяч тонн дизельного топлива и 30 тысяч тонн мазута.

Завод обладает перерабатываемой мощностью в 2,5 млн тонн нефти и газового конденсата в год. Но, как мы сообщали в сентябре, ввиду снижения поступления углеводородного сырья загруженность Бухарского НПЗ составляет 62,2%.

Отметим, что ранее строительство нефтеперерабатывающего комплекса в Джизакской области, начатое в апреле 2017 года, было приостановлено. Заместитель директора компании «Нефтегазинвест» Хусниддин Тураев отмечал, что приоритет отдан модернизации действующих Бухарского и Ферганского заводов.

Проект модернизации Бухарского НПЗ войдет в двухгодичную программу на 2019−2020 годы, в рамках которого всего будут реализованы девять крупных проектов государственного значения. Сумма освоенных инвестиций должна составить 1,3 млрд долларов.

Кроме того, в текущем году за счет инвестиций в 50 млн долларов на предприятии «Газлинефтгазказибчикариш» будет модернизировано и введено в строй оборудование по производству 80 тысяч тонн пропан-бутановой смеси ежегодно.

В 2019 году также начнется реализация проекта по расширению и реконструкции крупнейшего в Узбекистане подземного хранилища газа (ПХГ) «Газли» на сумму 800 млн долларов. Планируется довести вместимость хранилища до 10 млрд кубометров (сейчас предположительно 3 млрд).

В конце октября узбекская «Нефтегазинвест» и российская компания «Форус» создали совместное предприятие в рамках расширения мощности ПХГ «Газли» с разработкой месторождения.

Газовое месторождение «Газли» — одно из самых крупных в Бухаро-Хивинском регионе, эксплуатируется с 1961 года. Первоначальные запасы газа — около 500 миллиардов кубометров. В настоящее время газовые запасы месторождения истощены.

https://www.gazeta.uz/ru/2019/04/02/projects/
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #78 · (Edited)
Разведочное бурение началось на газовом месторождении в Сурхандарье



На газовом месторождении в Сурхандарьинской области началось бурение разведочных скважин.

Компания Surhan gas chemical operating company (SGCOC) приступила к разведочному бурению в Сурхандарьинской области на юге Узбекистана в рамках соглашения о разделе продукции (СРП), сообщили «Газете.uz» в компании.

В апреле 2017 года правительство Узбекистана подписало с консорциумом инвесторов — Gas Project Development Central Asia (GPD, дочерняя структура Gazprom International), Altmax Holding и «Узнефтегаздобыча» СРП на инвестиционном блоке «Узбекистон мустакиллиги» с доразведкой и разработкой газового месторождения «Мустакилликнинг 25 йиллиги» со строительством газоперерабатывающего комплекса в Сурхандарьинской области.

«На месторождении „Мустакилликнинг 25 йиллиги“ началась реализация программы „Ранний газ“. Первый этап данной программы предусматривает бурение разведочных скважин», — говорится в сообщении. По данным Минэнерго, SGCOC заключила контракт с международной сервисной группой Eriell на строительство 15 разведочных и оценочно-эксплуатационных скважин на месторождении.

Оператор в марте завершил полевые сейсморазведочные работы 3D на площади 160 кв. км и приступил к 2D-сейсмике в объеме 400 погонных км, уточняет министерство. Подрядчиком работ выступает BGP, подразделение China National Petroleum Corporation.

Проект будет реализован в два этапа. На первом этапе в течение 2018−2022 годов планируется провести бурение скважин, обустройство месторождения, проведения геологоразведочных работ на инвестиционном блоке, строительство инфраструктуры и газоперерабатывающего завода мощностью 5 млрд кубометров. Стоимость первого этапа оценивается в более 2 млрд долларов.

На втором этапе — с 2023 по 2025 годы — планируется строительство газохимического комплекса для производства полимерных продуктов в объеме до 500 тысяч тонн в год с глубокой переработкой товарного газа. СРП по разработке газового месторождения «Мустакилликнинг 25 йиллиги» со строительством газоперерабатывающего комплекса оценивался в 5,8 млрд долларов. Проект рассчитан на 35 лет.

https://www.gazeta.uz/ru/2019/04/09/surhan-gas/
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #79 ·
Приоритетная площадка для строительства АЭС — озеро Тузкан







Территория вблизи озера Тузкан Айдар-Арнасайской системы озер в Джизакской области выбрана приоритетной площадкой размещения атомной электростанции в Узбекистане.

Напомним, с августа 2018 года по март 2019 года проведен первый этап комплексных инженерно-изыскательных работ на потенциальных площадках размещения АЭС на четырех площадках в Навоийской и Бухарской областях в районе водохранилища Тудакуль и трех площадках в Джизакской области, вблизи озера Тузкан.

«С учетом результатов изысканий, инженерно-технической и экономической целесообразности и на основании решения объединенного заседания Республиканской рабочей группы по координации реализации проекта по строительству атомной электростанции на территории Республики Узбекистан и Научно-технического и экспертного совета Агентства по развитию атомной энергетики при Министерстве энергетики Республики Узбекистан, а также мнений специалистов и заключения международных экспертов — приоритетной площадкой размещения атомной электростанции определена площадка вблизи озера Тузкан Айдар-Арнасайской системы озер Джизакской области», — говорится в сообщении.

На сегодняшний день продолжается второй этап — проведение инженерно-изыскательских работ для лицензирования и утверждения выбранной площадки.

Для ускорения начала реализации проекта 17 мая был подписан контракт с предприятием «Aтомстройэкспорт», входящим в инжиниринговый дивизион корпорации «Росатом», на проведение инженерно-изыскательских работ под разработку технического проекта.

https://www.gazeta.uz/ru/2019/05/31/uzatom/
 

·
Moderator
Joined
·
9,751 Posts
Discussion Starter · #80 ·
Emirati company Masdar to build wind power plants in Uzbekistan



Abu Dhabi Future Energy Company PJSC (UAE) will build wind farms in Uzbekistan with a total installed capacity of 500 MW.

Abu Dhabi Future Energy Company PJSC (UAE) will build wind farms in Uzbekistan with a total installed capacity of 500 MW.

According to a presidential bill, an agreement on investments in the construction of wind power plants was signed between the Ministry of Investment and Foreign Trade of the Republic of Uzbekistan, Uzbekenergo JSC and Masdar company.

The project instructs the Ministry of Energy to engage a legal company "White & Case" and a financial consultant within the framework of the project until December 1, 2019.

https://uzreport.news/economy/emirati-company-masdar-to-build-wind-power-plants-in-uzbekistan
 
61 - 80 of 105 Posts
Top