SkyscraperCity banner

1 - 20 of 9013 Posts

·
Registered
Joined
·
3,842 Posts
Discussion Starter #1


Here's the place where one can find everything about development and urban
rehabilitation in the Peninsula Area-the main historical site of Constanta, also
projects of rehabilitation and renovation for old historical buildings in the whole area of
Constanta.



 

·
Registered
Joined
·
3,842 Posts
Discussion Starter #2
and let's start!

an example of how to recognize and show a building which is going to be rehabilitated.
thanks #Oz:cheers:



Se pare ca si aceasta cladire e in renovare.E situata mai jos de Hangout langa casa fraţilor Zambaccian (cea rosie).

Harta:

 

·
Banned
Joined
·
1,714 Posts
REABILITAREA CENTRULUI ISTORIC ETAPA 1:
-REABILITAREA SI CONSOLIDAREA FALZEI DE LA CAZINO CUPRINSA INTRE POARTA 1 SI PORTUL TURISTIC TOMIS
Lucrarile ncep in primavara.
 

·
Genuine Tatar
Joined
·
12,050 Posts

·
Banned
Joined
·
1,714 Posts
^^The bulding that he is talkin about is property of MAI, and is under rehabilitation.
May other buildins are in the same sittuation but you have to enter on all those little streets to find them, near Jolie Hotel there are sever buildings that are finished.
 

·
CONSTANTA
Joined
·
11,447 Posts
^^Bishop's residence.
:)
nope :) on the official list of Romania's Historical Monuments it says "Casa N. Pilescu, azi reşedinţa arhiepiscopală" it doesn't reffer to the Bishop in person :) i think you will find the term "archiepiscopal residence" within many sources
 

·
Αυτόνομη &
Joined
·
617 Posts
REABILITAREA CENTRULUI ISTORIC ETAPA 1:
-REABILITAREA SI CONSOLIDAREA FALZEI DE LA CAZINO CUPRINSA INTRE POARTA 1 SI PORTUL TURISTIC TOMIS
Lucrarile ncep in primavara.
if this year`s winter will be at least as harsh as the last one, there is a chance that the promenade from the Casino area will fall into the sea, and probably the Casino will suffer some damage as well
 

·
Banned
Joined
·
1,714 Posts
The Casino no, he is secure due to his three foundations.
The problem is with the seasidewalk that could suffer some damage if we'll have a hard winter....
By damages i mean that is possible for the park to fall in the sea.....
 

·
Banned
Joined
·
1,714 Posts
iar zic pe romaneste ca me rusine sa zic pe engleza ca inteleg strainii:faleza se mai tine doar in pietre, lucrare e complexa...se va injecta beton hidrotehnic intre pietre si se vor face lucrari serioase acolo, e posibil sa fie decopertat promenada ca sa se bage piloni sa tina faleza.
 

·
Αυτόνομη &
Joined
·
617 Posts
and isn`t it possible that the sidewalk/promenade will drag the casino with it in the sea? or at least it will suffer some damage
 

·
Banned
Joined
·
1,714 Posts
That is not the worst scenario, in the worst scenario the sea will reach the stairs that connect the seaside walk with Eliabeta Avenue............:(
 
1 - 20 of 9013 Posts
Top