P175-B development aid from China to revive PNR’s Bicol Express

NAGA CITY — Using the P175-billion overseas development aid to be borrowed from China, the Department of Transportation (DOTr) will revive the operation of the Philippine National Railway’s Bicol Express with reconstruction of a new railway system from Manila to Bicol, Undersecretary for Rails Cesar Chavez said.

“It is not a rehabilitation,” Chavez said at the Bicol Express Modernization Forum held here on Friday. “It will be a reconstruction. Everything will be new. New railways. New train wagons. New stations. New modalities.”

Chavez said China and the Philippines is set to sign the loan agreement of P175 billion payable in 20 years at 2 percent interest per annum on Nov. 16 and 17 at the time of the 31st Asean Summit and Related Meeting in Manila.

He said the revived Bicol Express would take six hours to reach Bicol from Manila with a design speed of 120 kph and operational speed of 80 kph.

With a timetable from 2018-2022, he said the reconstruction of the new railway system would be undertaken through Chinese general consultancy services while the determination of the firms to undertake the actual construction was still under negotiations.

He said there would be nine new train stations from Paco in Manila to Matnog town in Sorsogon, stretching 683 km of newly constructed railways following international standards.






http://business.inquirer.net/239005...cial&utm_source=Facebook#link_time=1508586440
1 - 20 of 1870 Posts
^^ From the same article:

The $$$ needed:

Chavez said China and the Philippines is set to sign the loan agreement of P175 billion payable in 20 years at 2 percent interest per annum on Nov. 16 and 17 at the time of the 31st Asean Summit and Related Meeting in Manila.
Speed:

He said the revived Bicol Express would take six hours to reach Bicol from Manila with a design speed of 120 kph and operational speed of 80 kph.
Sigurado daming sisilip dun sa interest rate at loan duration.

Sa speed naman, sana operational speed ay 80-100kph, depending on track condition/gradient
DOTr bares Bicol Express plans
NAGA CITY, Philippines (Bicol Standard) – Reconstruction, not rehabilitation.

This is the plan of Department of Transportation Undersecretary for Rails Cesar Chavez on the much-awaited Bicol Express project of the Philippine National Railways.

“Bagong riles, bagong estasyon, bagong bagon, management, sistema,” is how he described the government’s vision.
Chavez revealed that they intend to have the Manila to Bicol line be operational by 2022.
Under the new Bicol Express, passengers from Paco, Manila to Matnog, Sorsogon will have a travel time of only seven hours.
He also revealed that the project, which is estimated to cost P175 billion, will be funded by China.
“Action will start in six months,” he said.
http://m.philstar.com/414576/show/d58bdb33b4c82db193cc3c2a7e961e09/?
One more thing:

Let's hope this massive wet dream project will not suffer the same fate as Northrail, which ironically was funded by Beijing as well.
Excellent Thread... Just about to open a new one and came up with this. Anyway the 9 stations will be Lucena, Gumaca, Ragay, Naga, Iriga, Legazpi, Sorsogon, Irosin and Matnog.. There will be varieties of operations.. Ex. Bicol Limited Express originating from FTI to Matnog via selected stops, Bicol Regional Local originating Ragay to Matnog VV All Station, Quezon Bicol Express originating from Lucena to Matnog all station service...
  • Like
Reactions: 1
One more thing:

Let's hope this massive wet dream project will not suffer the same fate as Northrail, which ironically was funded by Beijing as well.
My friend it was Politics that destroyed the Northrail Project...
^^ From the same article:

The $$$ needed:



Speed:



Sigurado daming sisilip dun sa interest rate at loan duration.

Sa speed naman, sana operational speed ay 80-100kph, depending on track condition/gradient
I wish it were Japan instead of China funding this. Chinese ODA have been notorious for having high interest rates.
Cost Breakdown (Previous 151B Version)

Development Cost 500M
Civil Works 81,755M
Signal/Com. 3,669M
Land,ROW, Resettlement 53,718M
Rolling Stocks 10,441M
Eqmnt. and Machinery 1,223M
Is this for sure standard gauge? That is the biggest thing I am hoping for not just for Bicol Express, but for all rail lines, especially since this is a reconstruction from ground up. Its an opportunity to correct the mistakes of the past and would make the rail line far more efficient and serviceable. :yes:
My Sources reveals that there will be massive widening of row and curve radius corrections to make it up for sustained 120kph line speed without slowing down on curves. And also construction of rail overpassess on major intersections, pedestrian and animal crossing culverts and complete grade separation of the current line crossings. Our current PNR Main Line south curve radius is only 300m good for only 60kph speed.
  • Like
Reactions: 1
Is this for sure standard gauge? That is the biggest thing I am hoping for not just for Bicol Express, but for all rail lines, especially since this is a reconstruction from ground up. Its an opportunity to correct the mistakes of the past and would make the rail line far more efficient and serviceable. :yes:
MOD its guaranteed FUTURE ROOF, all brand new rail lines will be SGR according to DOTR..
  • Like
Reactions: 2
^^ From the same article:

The $$$ needed:



Speed:



Sigurado daming sisilip dun sa interest rate at loan duration.

Sa speed naman, sana operational speed ay 80-100kph, depending on track condition/gradient
120kph will be the design speed PNR maybe oprating on initial stage when this opens..
^^ well baka maging 160kph kung kaya naman diba?
The relocation costs alone will be staggering.
P175-B development aid from China to revive PNR’s Bicol Express

NAGA CITY — Using the P175-billion overseas development aid to be borrowed from China, the Department of Transportation (DOTr) will revive the operation of the Philippine National Railway’s Bicol Express with reconstruction of a new railway system from Manila to Bicol, Undersecretary for Rails Cesar Chavez said.

“It is not a rehabilitation,” Chavez said at the Bicol Express Modernization Forum held here on Friday. “It will be a reconstruction. Everything will be new. New railways. New train wagons. New stations. New modalities.”

Chavez said China and the Philippines is set to sign the loan agreement of P175 billion payable in 20 years at 2 percent interest per annum on Nov. 16 and 17 at the time of the 31st Asean Summit and Related Meeting in Manila.

He said the revived Bicol Express would take six hours to reach Bicol from Manila with a design speed of 120 kph and operational speed of 80 kph.

With a timetable from 2018-2022, he said the reconstruction of the new railway system would be undertaken through Chinese general consultancy services while the determination of the firms to undertake the actual construction was still under negotiations.

He said there would be nine new train stations from Paco in Manila to Matnog town in Sorsogon, stretching 683 km of newly constructed railways following international standards.






http://business.inquirer.net/239005...cial&utm_source=Facebook#link_time=1508586440


Kaya pala ang notice sa mga me ari ng bahay na nadinig ko ayon sa mga pagpupulong nila halimbawa sa Los Banos area along the tracks ay may clearance na 6 meters sa magkabila.. Marahil ito ay para sa double track railroad na plano nila .... This is good news. Saka sa may IRRI area pwedeng lagyan ng bagong station instead na sa Junction Los Banos dahil sa sikip at traffic ng area na un. Just a proposal sa gobyerno at sa PNR.
^^ Boss considered na yang new College / IRRI station

Yung bundok at lupain dun sa meh bundok na meh blue cross sa gabi, PNR property yung halos lahat ng yon (dun kumukuha ng ballast nung MRR-era days)
Mod question:

So all of the news/analysis/photos/etc regarding the MLS reconstruction will be put here, but the general PNR news [among others] will still be posted at the Riles Thread?
According to Asec. Chavez, PNR South Long Haul SGR will be done in 4 sections of each 150km distance by 4 Gen. Contractors SIMULTAENOUSLY.