SkyscraperCity banner

Status
Not open for further replies.
21 - 40 of 13669 Posts

·
Registered
Joined
·
1,161 Posts
Nice! Man, your gonna spend some time on that bike this summer then I guess. ;) We like!

Seems like the front of the hotel will have quite a massive impact when completed. That hotel + the new kungsbron building will be my two new favourites architecture-wise among the new projects in that area.
 

·
Rex Dominus
Joined
·
1,388 Posts
update 13: Svea Artilleri, Nedre Gärdet, Östermalm, Stockholm

Name : Svea Torn
Owner : Vasakronan AB
Project descriptions : 16 Storey Residencial 70 apartments
Location : Svea Artilleri, Nedre Gärdet, Östermalm, Stockholm
Starts : 2005
Finnish : 2007

if you have Google Earth installed you can click here to see the location.

it has now reached its full hight, ofcource it cold have been taller but for Stockholm its quite ok :)

construction pictures from 2007-03-14











 

·
Registered
Joined
·
1,161 Posts
A welcome contribution to Sthlms skyline! I dunno why but I like it alot. More curved surfaces to the people; enough with the boxes already. :) Do you know if there's gonna be a restaurant/café at the top? Doesn't matter though, I guess it'll only be available for its inhabitants anyway.
 

·
Zug->für 'ne bessere welt
Joined
·
7,759 Posts
Discussion Starter #25
Abstract: Stockholm will get another small, subterranean shopping centre.

Hornstull får "Västermalmsgalleria"
Stockholms stad har sålt Hornstulls högsta hus för 149 miljoner kronor. Köpare är John Mattsson Fastighets AB, som med SL och staden har stora planer på att utveckla hela stadsdelen.


- Det är viktigt att bevara Hornstulls själ, säger Siv Malmgren, vd för John Mattsson.

Som DN tidigare har berättat tänker John Mattsson AB bygga en affärsgalleria i tre plan i sin fastighet öster om Långholmsgatan, som i dag bland annat rymmer ett Systembolag och en Konsumbutik. Där ska också Stockholms stad bredda trottoaren och plantera nya träd.

Efter långa förhandlingar med en rad intressenter har staden nu även valt ut John Mattsson som köpare till fastigheten Sågen på västra sidan av Långholmsgatan. Ett åtta våningar högt hus byggt 1958, mellan Hornsgatan och Bergsundsstrand.

- Hela Hornstull är ju ett slitet område som behöver en rejäl uppryckning. Det har funnits många idéer för huset, men vi tror att John Mattson har både resurserna och seriositeten för att göra det här arbetet, säger Sten Wetterblad, chef för fastighets- och saluhallskontoret.

Tanken är att affärsgallerian på Långholmsgatans östra sida via t-baneplanet ska bindas ihop med en galleria i fastigheten Sågen.

SL ska i sin tur rusta upp den slitna tunnelbanestationen. Samtidigt har även andra fastighetsägare i området planer på att bygga om sina hus, bland annat SEB Trygg som äger kvarteret som i dag rymmer Biblioteket och Apoteket. Där vill man öppna en ingång till gården, och skapa butikslokaler. Men projektledaren Marita Loft framhåller att planerna är lösa än så länge.

John Mattsson AB ser framför sig ett samarbete med såväl staden, SL som andra fastigheter för att lyfta hela området.

- Hornstull har väldigt stora kvaliteter, med sitt folkliv, närheten till vattnet och all verksamhet som byggts upp med Street. Det är en omtyckt, men sliten plats, som har en själ vi vill bevara. Samtidigt behöver området tillföras bashandel, i form av kläder, skor och sådant som hör till vardagen, säger Siv Malmgren, vd på John Mattsson Fastighets AB.

Västermalmsgallerian på Kungsholmen är något av en förebild, med sina butiker i tre plan, inklusive t-baneplanet, och sin inglasade fasad.

- Men det är viktigt att den här gallerian får en karaktär som passar i Hornstull. Man ska känna att man är på Söder. Det är en utmaning, som vi löser bäst genom att samarbeta med de som redan finns i området.

I ett första steg ska fasaden på fastigheten Sågen göras om, och få ett modernare uttryck med stora glaspartier. De sju våningarna med kontorslokaler över gallerian ska renoveras och kan vara inflyttningsklara hösten 2008.

Den stora sammanhängande affärsgallerian kan tidigast invigas under 2011.

Kontraktet på fastigheten Sågen undertecknades på torsdagen, och det träder i kraft under förutsättning att det godkänns i fastighets- och saluhallsnämnden liksom i kommunfullmäktige.

Källa/Source: http://www.dn.se/DNet/jsp/polopoly.jsp?d=1298&a=629327
 

·
Zug->für 'ne bessere welt
Joined
·
7,759 Posts
Discussion Starter #26
Stockholm 2007, small-scale, loooooooong-term planning... :sleepy:
 

·
Registered
Joined
·
103 Posts
Some more info on that mysterious hotel in Hammarby Sjöstad. It will be located in the Sjöstadsporten area in the south-east, right where the old plans for Stockholm's Olympic Stadium were.
That is, right here:



Around 15 floors, the latest plan says 54 meters.
Also, right next to it, an office tower of the same height will be built.

Pic of the hotel.


Pic of the office (possibly?)


Project info in Swedish:
http://planer.sbk.stockholm.se/SBKPlanTemplates/SBKPlanView____8240.aspx
 

·
Registered
Joined
·
289 Posts
The hotel and congress hall by the central station (Klara Kongress) is as of yesterday finally on exhibition (the stage before approval). It will be exhibited until April 16th. According to the city's homepage, construction will start within the year. But we'll see :lol:


Elavtion seen from the east


From the west looking downtown


And then this one from the south, that I think has been posted a few times
 

·
Registered
Joined
·
1,161 Posts
I'd put my money on 'Klara kongress/hotell' (which is really nice btw). Hammarby sjöstad and highrises equals impossible. :( It's too bad cause' the whole area is waaaay to homogeneous atm, although unbelievably clean and "fresh".
 

·
forumer #29
Joined
·
4,570 Posts
Klara is probably gonna get some flak for being too boring. IMO it isn't, and also making it more avantguard is doomed to failure (since then all the "Inner City is never to be changed" people would go nuts).
The towers in Hammarby look so-so too, nothing exciting but still kinda nice.

Read in the paper edition of DN today that approval from the (newish) goverment of the Citytunnel is getting closer. Since all the people around the county want it (instead of the insanely stupid third-track idea), all they managed was delay it for maybe 6 months (and adding milions to the cost).
 

·
Zug->für 'ne bessere welt
Joined
·
7,759 Posts
Discussion Starter #35
Nice designs. But high-rises? Nah. I would like to see them doubled-> 16 *2 = 32. Then we're talking...
 

·
Stockholm rules!
Joined
·
1,740 Posts
There is a good progress in building taller buildings in stockholm right now. It's a step towards highrises/skyscrapers. They can't drastically build skyscrapers , that might get citizens in Stockholm pissed. It's good that they are considering buliding less tall buildings at the moment to prepare the citizens for Burj Dubai's! :D

BTW, nice designs, thanks for sharing.
 

·
Registered
Joined
·
59 Posts
Klara Kongress pdf

Some more pictures and details for Klara Kongress och Hotell, maybe it's been posted before, but here goes: PDF

Its gonna be a welcome addition to thea pretty screwed up part of town that is Klara. :)

.R
 

·
Registered
Joined
·
6 Posts
New member

I recently found this forum and I'm impressed by the interest of the people writing here. This will be my new no.1 point of reference from now on. :)

I live in Hammarby Sjöstad and will try to keep you updated with photos of new projects. Unfortunately I only posess a cell phone camera (2 megapixels) but it's better than nothing!

Keep up the good work!
 

·
Stockholm rules!
Joined
·
1,740 Posts
Welcome David! Nice to hear that you'll post updates of Hammarby Sjöstad. I 'm usually the one that updates Hammarby Sjöstad. Been a while though, the previous update i did was back in December. Huge progress over there since then! The 14 floor cube as risen above the other lower buildings and other new buildings have come really far. Especialy in Lugnet and Hammarby Gård. And ground work on Henriksdalshamnen has started. I will go to Hammarby Sjöstad to take some nice pis (hopefully, but with most certainty) This easter vacation. Be prepared :p
 
21 - 40 of 13669 Posts
Status
Not open for further replies.
Top