Planned 8 metro lines with total length of 231.5 km


Under construction

Line M3 - construction period 2010-2014


Planned near-term

Line M2 - construction period 2012-2016

Line M1 - construction period 2013-2017

Line M4 - construction period 2014-2018

Line M6 - construction period 2015-2018


Four commuter rails with with combined total length of 287.9 km


 

·
The Explorer
Joined
·
5,130 Posts
^^ Is M3 connects to the Qingdao International Airport?
 

·
Leudimin
No 41, not good
Joined
·
9,169 Posts
Ten stations from and including Qingdao North Station puts one at Shuangshan. Anyway, I didn't think the year-end opening festival could start that early. Congratulations Qingdao! Now looking forward to the opening of the remainder of line 3 (12 stations), as well as line 2. Apparently line 1 has not started construction yet.
 

·
PC LOAD LETTER
Joined
·
7,891 Posts
The first city that begins with the letter "Q" to open its own metro! Quito (Ecuador) and Qom (Iran) are likely to follow.

Of course, I am not counting Quincy, MA (Boston area) or Quezon City (Manila area), which are served by metros based in other cities.

And now every letter of the alphabet has a metro city!
 