Kratos1211 answered it perfectly:

Higher cost means longer time to recoup investment plus profit and it being a User Pay principle means higher toll fee for us.
 

·
Registered
Joined
·
4,456 Posts
Simple - co$$$t.

Kaya gumawa ng tunnel di naman bago technology nan - question is, will be the private proponent be able to recoup their inve$$$tment?
Depende kasi itong costing sa situation.. Pedeng makamura or mapamahal kapag maggaling at di buwaya yung mga cost engineer. Sadyang dikit lang ang DMCI at EEI sa SMC.
 

·
Registered
Joined
·
1,175 Posts
PTP Mods here: what to expect in the upcoming MMSP in the ongoing Angat-Ipo 4th tunnel construction using a TBM

Kung kaya sa dam, kaya din sa expressways. Sana ganito na lang gawin nila sa portion ng Quezon. Mas diretso ang alignment, mas less ang environmental impact as compared sa cut and fill at hindi pa problema ang RROW. Buti pa ang Norte 3 hours na lang. Hanggang kelan kaya ang 12-14 hours land travel pa-South. #BicolNaman :LOL:
 

·
Registered
Joined
·
22,601 Posts
^^ Though similar in method, sobrang laki din ng diff boss.
  • yung isa tubeg lang so relatively maliit lang diameter, yung isa expressway so minimum 4 lanes aka 2x2 + shoulder lane + emergency bay na following standards, mas malaki yung butas, need din emergency exit / ventilation shafts / electrical cabling / etc.
  • TL;DR: It all boils down to the $$$ :D
 

·
Registered
Joined
·
1,175 Posts
Ahhh oo nga mas komplikado nga pala ang design ng expressway tunnels. Pero kung gusto talaga ng gobyerno ma-decentralize ang pag-unlad at hindi lang sa Metro Manila, isipin sana nila na paglaanan ng pondo ang ganitong mga proyekto. May halo na rin sigurong pulitika kaya napag-iiwanan talaga ang Bicol region. :cautious:
 

·
Registered
Joined
·
133 Posts
Kung kaya sa dam, kaya din sa expressways. Sana ganito na lang gawin nila sa portion ng Quezon. Mas diretso ang alignment, mas less ang environmental impact as compared sa cut and fill at hindi pa problema ang RROW. Buti pa ang Norte 3 hours na lang. Hanggang kelan kaya ang 12-14 hours land travel pa-South. #BicolNaman :LOL:
I'm no engineer yet but I guess they could "future-proof" it by incorporating to their plan a future tunnel when it's economically feasible to do so.
 

·
Registered
Joined
·
1,427 Posts
I'm no engineer yet but I guess they could "future-proof" it by incorporating to their plan a future tunnel when it's economically feasible to do so.
I think an expressway also on Samar&Leyte will justify a tunnel. Pwedeng yun muna ang unahin.

Kasi pag may expressway na sa kabila tataas yun pressure sa RoRo at it will force the governments' hand to build a better link. Ganun din sa Mindanao dapat expressway ang unahin from Surigao to Davao to follow yun link either tunnel/bridge.
 

·
Registered
Joined
·
22,601 Posts
^^ As I've expected.

Remember, SMC thru SMHC has a signed MOA with PNCC to construct a toll road until Sorsogon aka TR5.

Ilang beses ng paulit ulit yan dito :D
 

·
Beautiful User
Joined
·
1,878 Posts
Latest status update of this project View attachment 264287 what is the difference of this project versus TR5?
Millions ang ginastos sa feasibility study then ang outcome "conflict with SLEX-TR5 Project which was already approved by the Toll Regulatory Board (TRB)". Sana man lang inalam muna ang other similar proposals at ang legalities nito bago nag proceed ang expensive feasibility study. Sa ibang proposed tollway project nalang muna sana na allocate ang feasibility study budget tulad ng Manila-Quezon Expressway (via Rizal & eastern Laguna).
 

·
Registered
Joined
·
4,456 Posts
Sana nga lang inunder ng ODA ito para hindi local contractor ang maging gencon. Mas sanay sa butasan ng bundok ang mga foreign contractors compared sa local contractors
 