SkyscraperCity banner

1 - 20 of 211 Posts

·
Moderator
Joined
·
9,250 Posts
I hope if thats true, we will see some acceleration in construction.
Those buyers will surely want to see the tower built as fast as possible.
 

·
Moderator
Joined
·
4,495 Posts
Are those extra support columns necessary because they can't use anchors on that side of the road (because of the subway being built)? I saw the same columns in the Lieber Tower which is also next to the future subway, but they are not common in Israel.
 

·
Moderator
Joined
·
9,250 Posts
Interesting preposition.
I dont think thats the case though.
Red line path is on the other side of the road so at least 20-30 meters away.
I would guess maybe because there is some underground structure beneath Begin road in this area?
Maybe service tunnel?
 

·
Moderator
Joined
·
9,250 Posts
I am afraid its frozen for now :(
Either sales aren't going as great as expected or maybe Amot tower construction is interfering with theirs?
 
1 - 20 of 211 Posts
Top