From 1957-1994 the power grid of Sicilia was connected with that of the Italian mainland by a 220 kV-overhead line crossing Messina Strait. In 1994 a 380 kV submarine cable was installed and now a further 380 kV cable should be laid with a length of 38 kilometres.



There are some questions:
how many 380 kV circuits run actual from Calabria to Italy? 1 or 2?
How is the overhead line designed from Sorgente and Rizziconi to the cable terminals? For 1 or for 2 circuits?
Where is the actual terminal of the 380 kV power cable on Sicilia? In Calabria it is at 38.241397 N 15.6888279 E
 