SkyscraperCity banner

1 - 20 of 292 Posts

·
Banned
Joined
·
1,266 Posts
Discussion Starter #3
HELLO to everybody
i send this message especially to the french forumers living in Alsace_Strasbourg..
you can post your news about Strasbourg in this thread!!
thanks ! best regards !:):)
 

·
Registered
Joined
·
3,293 Posts
Extension of the tramway toward Kehl (Germany)



New tramsets





Construction of a tramway and pedestrian bridge over the Rhine between Strasbourg and Kehl





Vidéo posted by la compagnie des transports strasbourgeoise


Work in progress

06/07/2016




--

Construction of a pedestrian and tramway bridge over a canal


Fool




Fool
 

·
Registered
Joined
·
3,293 Posts

·
Registered
Joined
·
3,293 Posts
Department store : Le Printemps

Refurbishment and extension

Completion : 2014
Architect : Christian Biecher




Printemps Store in Strasbourg by Christian Biecher




LUC BOEGLY

Situated on the historical Strasbourg Place de l’Homme de Fer, the corner building in which Printemps presents its deluxe department store offerings was recently the center of a major renovation entrusted to French architect Christian Biecher. (...)


http://www.urdesign.it/index.php/2013/05/29/printemps-store-in-strasbourg-by-christian-biecher/
 

·
Registered
Joined
·
3,293 Posts
Université de Strasbourg


Le Studium (Learning center)

floor space : 7 950 m2
Cost : 30M d'€
Completion : 2019
Architect : Jean-Pierre LOTT



Esplanade - Le projet de l’architecte Jean-Pierre Lott retenu par l’Université

Le futur Studium

Les ondulations du Studium, tout à la fois bibliothèque nouvelle génération et maison de l’étudiant, en bordure du boulevard de la Victoire, vont marquer une nouvelle étape importante dans la mue du campus de l’Esplanade.
(...)
http://www.dna.fr/edition-de-strasbourg/2016/02/23/le-futur-studium
 

·
Registered
Joined
·
3,293 Posts
Université de Strasbourg

Pôle d'administration public de Strasbourg :
The Centre will include :
l'Institut d'Études Politiques (IEP)
l'Institut de préparation administration générale (IPAG)
l'Institut des Hautes Études Européennes (IHEE)

floor space : 15 000m²
Cost : 52M d'€
Architect : Lipsky+Rollet Architectes
Completion : 2017 ? 2018 ?

New premises









-jojo-

Unfortunately, the construction site has been stopped following the discovery of crack on the structure. An investigation is underway.
 

·
Registered
Joined
·
3,293 Posts

·
Registered
Joined
·
3,293 Posts
Centre de recherche en Biomédecine de Strasbourg / Biomedecine centre research

Completion : 2017
Cost : 40M d'€
floor space : 14 000m²
Architect : Groupe-6




Intégré dans un programme de rénovation de l’actuel campus de la faculté de médecine, le projet prévoit la construction de 12 000 m² de laboratoires avec animalerie sur 7 niveaux, en remplacement d’une barre des années 1960. Situé en plein centre-ville, le CRBS s’est donné pour objectif la transformation du campus de la faculté de médecine en un véritable parc urbain. A ce titre, il opte pour une implantation favorisant les espaces piétonniers et publics. Le CRBS adoptera les silhouettes des îlots voisins datant du 19ème siècle, et formera un volume compact permettant une optimisation énergétique maximale. Ce volume unitaire se démarque par une architecture novatrice et s’enveloppe d’une fresque pixélisée.


In progress

-jojo-
 
1 - 20 of 292 Posts
Top