DTPC is now leading the development of Block D in the next phase of Dube City. This mixed-use development encompassing 34 000m² of bulk will consist of a 172-bed hotel, 15 000m² of offices and 2 500m² retail on the ground floor.


UNDERGROUND BASEMENT PARKING

DTPC will be designing and constructing underground basement parking, with
approximately 500 parking bays. Design and procurement of the double
basement will begin in June 2012 and construction will commence April 2013 and be completed in early 2014.


DEVELOPMENT OPPORTUNITIES

DTPC is looking for developers to develop a hotel and/or offices on the site.
The development will surround a vibrant public space which will link in with Dube Square which was complete in March 2012. The entire precinct at Dube City will be a fully serviced high quality, pedestrian-oriented and landscaped environment, and will provide an efficient, convenient, comfortable and safe
business platform."
 

·
BOFH Extraordinaire
Joined
·
3,891 Posts
Looks good.....

Could easily be in Umhlanga NTC though.. the design seems like it would fit there very well as well.
 

·
Moderator
Joined
·
23,070 Posts
Discussion Starter · #4 ·
^^ well this Dube City area is based along similar principles of the Umhlanga Ridge
 

·
Moderator
Joined
·
23,070 Posts
Discussion Starter · #6 ·
^^ could say that about almost every single urban area development worldwide
 

·
Moderator
Joined
·
23,070 Posts
Discussion Starter · #7 ·
guys anyone know the status here? the news of the chinese investment and the shree sites came earlier this year. anyone have more detail?
 

·
Moderator
Joined
·
23,070 Posts
Discussion Starter · #8 ·
Construction underway on excavation for the 2 basement parking levels

 

·
Crazy Loony Archistudent
Joined
·
125 Posts
Well render undersell the beauty of the scheme, but i think its gonna shine like the Allan Gray building in Cape Town. Just needs to be built properly
 

·
East Coast Massiv
Joined
·
16,652 Posts
This one took a few u-turns in terms of whose going to build it, it was Dube, then Private investor took over, then Dube wanted to do just the basement level but now Dube has taken over the entire development again. Tender is currently out for the building, the basement tender falls under a different contract.
 

·
Moderator
Joined
·
23,070 Posts
Discussion Starter · #14 ·
Seems FWJK have taken this on. State it will offer 21,000m2 office space and ground floor retail. New renders more streamlined.