Project Components
The Project is located in a jurisdiction area of Muang District in Nonthaburi Province.
The beginning of project locates at Nonthaburi 1 Road that is an existing road on the east side of the Chao Phraya River. Then the route is aligned towards the west direction crossing the river by a bridge including its connected viaduct before connecting to the existing road, Wat Bot Don Phrom-Thanam Nonthaburi Road, on the west side of the river. From this connecting point the route is aligned coinciding with the existing road at an approximate length of 1.7 kilometers to the end of project at Ratcha Phruk Road, a main road network in the north-south direction on the west area of the river. The total length of the Project is as of 4.3 kilometers approximately.
the Project can be classified into 4 main components as shown ;
1. An interchange at Nonthaburi 1 Road and a flyover at Muang Nonthaburi Bypass Road
2. A 6-lane extradosed prestressed concrete bridge of 200 m. main span of which the total length is 460 m.
3. A 6-lane at-grade road
4. An interchange at Ratcha Phruk Road