Six towers with 1272 apartments, awarded to Construction Group Contracting House (CGCH).

According to Aldar, the apartments are expected to be ready for delivery in Q1 2020.

http://www.constructionweekonline.com/article-46552-uaes-aldar-awards-203m-contract-for-the-bridges-on-reem-island/
1 - 19 of 19 Posts
Scale model in the office lobby of Sky tower.
Not many swimming pools.
Canal in the middle.

Reem island by N D, on Flickr

Reem island by N D, on Flickr
Would the pools be on top of the buildings?
Would the pools be on top of the buildings?
In these models, they are on the ground floor
Interesting. I wonder will they be like the arc/gate pools in the end?
Plot RS2 - C27

Works started on phase 1 (the "Saadiyat side")
Client: Aldar Properties
Consultant: Aecom
Contractor: Construction General Contracting House
Piling: Dutch foundation company

4 piling rigs, 3 cranes, a few other machinery
on site
NG]
[/url]Reem island 20171103 by N D, on Flickr

Reem island 20171103 by N D, on Flickr

Reem island 20171103 by N D, on Flickr

Reem island 20171103 by N D, on Flickr

Reem island 20171103 by N D, on Flickr
23rd March, piling well ongoing
Starting to rise above ground now.

20180624_090521 by M4RT84, on Flickr

20180624_090241 by M4RT84, on Flickr

20180624_220703 by M4RT84, on Flickr
  • Like
Reactions: Munwon and isicman
The three towers to the north of the canal are well above ground now, levels 9, 6 and 4, with groundworks continuing on the 3 towers south of the canal.

20180905_163717 by M4RT84, on Flickr
  • Like
Reactions: Munwon and isicman
Also on Reem Island, subcontractors have now been appointed for all necessary works at The Bridges, Aldar’s six building development launched in April 2017, the developer said in a construction update report.

https://www.arabianbusiness.com/con...reem-island-project-meera-close-to-completion
I didn't understand how the pools will be displayed. Along one entire floor?
I didn't understand how the pools will be displayed. Along one entire floor?
You can see them on post #6, they are on the ground floor, in between the buildings. About half the length of a building as per the scale model
  • Like
Reactions: Lissica
Superstructure mostly completed. Visible works going on. No sign of cladding as yet. Reem Central Park opposite, now open, will be a big pull for tenants.

2019-02-05 15.15.59 by Z S, on Flickr
Taken from Reem Central Park, the 3 on the right have topped out and the 3 on the left only have about 5-10 floors to go.

20190513_105724 by M4RT84, on Flickr
The first 3 are fully cladded and the remaining three are topped out
Aldar reveals construction updates on Reem Island, Yas Island projects

Following the completion of construction on the first three towers of The Bridges project on Reem Island, Aldar Properties has begun handovers of the 636 apartments offered.
Construction is progressing on the remaining three towers in the project. The Bridges will also feature pop-up shops, a café, and outdoor fitness equipment.



  • Like
Reactions: BeestonLad