Reconstruction and Improvement of Tuen Mun Road - Eastern Section

Official Contract Website:
http://www.tmre.com.hk/TMRE/Project.htm
"Area of works under Reconstruction and Improvement of Tuen Mun Road – Eastern Section inclusively covers east of Tsing Lung Tau Bridge."
The scope of the works of the contract includes the following major items
Official Contract Website:
http://www.tmre.com.hk/TMRE/Project.htm
"Area of works under Reconstruction and Improvement of Tuen Mun Road – Eastern Section inclusively covers east of Tsing Lung Tau Bridge."
The scope of the works of the contract includes the following major items
- reconstruction and re-alignment of 6.8km section of Tuen Mun Road between Tsuen Wan and Tsing Lung Tau to current expressway standards;
- widening of sections of the existing at-grade carriageways and vehicular bridges and highway structures including Tsing Lung Tau Bridge, Telford Bridge, Ting Kau Viaduct and Yau Kom Tau Bridge; and widening the eastern end of Sham Tseng Viaduct eastbound carriageway to meet current expressway standard with the associated provision of hardshoulders and verges;
- re-provisioning and modification of existing footbridges ;
- improvement of Sham Tseng Interchange;
- replacement of the existing road restraint system with new types of parapets and roadside barriers;
- installation of noise barrier or semi-noise enclosures along Tuen Mun Road at Tsuen Wan, Yau Kom Tau, Sham Tseng and Anglers' Beach;
- ancillary works including slope, drainage, landscaping, water and utility works; installation of traffic control surveillance and fire fighting systems; modification of direction signs to current expressway standard; natural terrain hazard mitigation measures ; and provision of catchwater decking.