SkyscraperCity banner
1 - 20 of 33 Posts

·
Brief State of Euphoria
Joined
·
4,010 Posts
Discussion Starter · #1 ·
PAAET Special Training Center
KEO International Consultant (KEO) was commissioned by the Public Authority for Applied Education and Training (PAAET) to undertake the study and design of the Special Training Center (STC) in the Site of the College of Technological Studies Campus in Shuwaikh.

The Key organizational elements that have been used in the design to give form to the basic Design Principles are: The learning street, the commons, and the body and the concept of complementarities.







The learning street:
Two streets lead from each of two gateways to the central commons. The East gateway is directed to the primary female circulation axis of movement, while the male circulation and gateway is placed to the west.

The “Student Learning Streets” is to emphasis that knowledge transfer is not limited only to the classroom, but to the total educational experience of being
in higher places of education. They are twenty-two meters high with a great canopy of solid panels (powder coated aluminum panels at the external and internal surfaces) and partially ceramic frit skylights. The skylight is constructed structural steel members.

The structural frame composed from algorithm. The streets are alive and actively landscaped with trees and contain café seating areas adjacent to the student bookshop, access to the auditorium, to exhibits, student lounges, the gym and to a set of Escalators that leads easily to the first floor. The street is reminiscent of the Souk, the Bazaar, the Mall, where banners will fly, advertisement for special IT programs and events where students and faculty can gather for a social hour. The street is the place of the “STC Community Spirit”.

The Commons:
The synthesis of these complementary forces of IT technology, socially friendly teaching environments and gender separation have generated the basic conceptual design of the STC. The center has been planned around a central core containing the control rooms and network server rooms. From this core, all IT infrastructures is received and distributed through fibre optic, copper and wireless means. Throughout the building, “prep rooms” contain hubs for telecom, media, and computer distribution. The central core also contains the learning resource center (library) which shall serve as the pivotal
reservoir of information. Below the library is located the Technology commons and multi-media auditorium.

Here are seminar and exhibition rooms to demonstrate the vital workings, capabilities, benefits, and achievements of this center of IT excellence and to ntegrate with the private and public sectors and out-reach programs to help keep STC updated with the latest advances in IT Technology.

The Body:
Surrounding the street and commons on the south side is the academic body of STC that contains the teaching facilities. Complementing this half on the north side is the academic support body, which contains faculty and administration offices and the student daily life facilities. The functions of the Academic “body” are stacked into four vertical levels above ground and one partial basement.
The functions of the commons and academic support body are located on two floors above ground and below the faculty / administration parking spaces.

Complementarities:
The relationship between labs, classrooms, lobbies, lounges, faculty offices and circulation paths encourage maximum interaction and provide a variety of spaces for informal discussions and impromptu work sessions.Complementing the human spaces of knowledge transfer, are the advanced technology requirements of the IT systems of the center. The key words here are “flexibility” and “simplicity”.

The shared function of the commons, the gymnasium and the student street have all been conceived to provide the needed sense of integration for both economical reasons and the lasting memory of the STC for future Alumni.

The Exterior Garden and Parking:
Surrounding the “body” is an exterior garden of dynamic design related to the specific functions of the STC and related to the orientation of the sun. The gardens will also serve as the interface between the STC and the surrounding buildings and roadways of the PAAET Campus. To the South behind the building will be placed the parking garages for female and male students.

They are three storey structures and have been carefully placed with the natural gradients of the site to be least visible. Concrete pedestrian bridges will connect the parking garages to the first level of the academic wing.

Client: Public Authority For Applied Education And Training
Estimated Cost: $ 102 Million
Design Completion: 2004
Services Provided: Infrastructure Design, Architectural Design, Interior & Landscape Design, Structural Engineering Design, Mechanical Engineering Design Electrical Engineering Design, Signage & Graphic Design
 

·
Brief State of Euphoria
Joined
·
4,010 Posts
Discussion Starter · #2 ·
can any one confirm if this project is under construction ?
 

·
Q8-PROJACTS-1
Joined
·
310 Posts
هل مشروع خلص مشروع معهد تطبيقي الاتصالات وملاحة المشروع تم تنفيذة
 

·
an amazing user ;)
Joined
·
288 Posts
any photos ?
 

·
Q8-PROJACTS-1
Joined
·
310 Posts
مجمع الهيئة في الشويخ وتوسيعات «الصحية» و«التكنولوجية» و«التمريض» واستاد رياضي و«المهني» للجهراء


مشاريع التطبيقي.. خطط طموحة ومقرات جديدة


مشروع الاستاد الرياضي والخدمات الرياضية:
يقع المشروع في الجهة الجنوبية الشرقية لمجمع الهيئة بالشويخ، يحتوي المشروع على انشاء استاد رياضي أولمبي يتسع لعدد8.000 متفرج (ثمانية آلاف) مع 50 مقعدا مخصصا لكبار الشخصيات.
يتكون المشروع من ثلاثة اقسام:
-1 الاستاد الرياضي: وهو عبارة عن استاد كرة قدم محاط بمضمار سباق بطول 400 متر، والاستاد مزود بملجأ لعدد 100 شخص.
-2 الصالات الرياضية الداخلية: وتشمل صالة رياضية متعددة الاغراض مخصصة لألعاب السلة والطائرة واليد، مزودة بمدرجات تتسع لعدد 400 شخص ومسبحا اولمبيا وصالة غوص للارتفاعات 15م، 7.5 م، 6م، 5م، 3م، و1م وناديا رياضيا للهيئة التدريسية وصالة اسكواتش مقسمة الى ثلاثة ملاعب مع مدرجات لعدد 200 شخص.
-3 الصالات الرياضية الخارجية: وتشمل ملاعب لكرة الطائرة ولكرة السلة وللتنس الارضي ومضماراً للتسخين والتدريب.
علماً بأن الصالات الداخلية مرتبطة بالاستاد الرياضي بممر مشاة مغطى. كذلك هناك مواقف سطحية مخصصة لعدد 1110 سيارات.
وتبلغ القيمة التقديرية للمشروع خمسة وعشرين مليون دينار.

تم بدء بالمشروع بتاريخ 25-11-2011
 

·
Q8-PROJACTS-1
Joined
·
310 Posts
مشروع انشاء ادارة معهد تطبيقي مكون من برج 23 طابق ولانة تم بدء بل عمل ونسبت الانجاز 27 % والمشروع يقع في منطقة شويخ امام مبنى الاتصلات والملاحة
 
1 - 20 of 33 Posts
Top