Puduraya to get facelift
RM30m upgrade to be completed next year
Pearl Lee
Friday, July 3rd, 2009 07:39:00



BETTER FOR THE PEOPLE: Jaafar (right) answering
questions from the media on the newlook Puduraya

ALL is set for Puduraya to be the landmark of KL after its upgrading works are completed by the end of next year.

UDA managing director Datuk Jaafar Abu Hassan said yesterday the company welcomed the Prime Minister's comments to upgrade the building for the comfort of the people.

"There would also be a banking hall concept with around 10-12 counters that would provide electronic ticketing services. We feel this would tackle the tout problem," Jaafar said.

He added that currently Puduraya caters for between 75,000 to 80,000 people on a weekday and over 100,000 people on weekends, excluding festive seasons.

When asked if upgrading works for the terminal could cope with the demands when Puduraya is fully converted into a city bus terminal, Jaafar said: "The refurbishment works is to cater for current needs that are pressing. We are not doing it for that (city bus terminal)."

The three-stage makeover, which will cost a total of RM30.3 million, will see the 33-year-old bus hub being refurbished with escalators, walkalators, a bigger and more comfortable waiting area akin to that found at airports.

Electronic ticket booking facilities will also be introduced.

A budget of RM25m that will be used for the refurbishment works was tabled at the Finance Ministry and was approved by the government.

Stage one of the refurbishing works, which would costs RM5.3 million, is funded wholly by UDA Holdings Berhad and ongoing works include upgrading the fire resistance system, building a pedestrian walkway between the Plaza Rakyat LRT station and Puduraya, painting works, upgrading of toilets as well as adding more waiting areas at the mezzanine level.

Other initiatives taken under the second and third phases would include a new food court and surau, adding of more passenger lifts, introduction of children playing area, additional cargo lifts and replacing new exhaust fans at the basement.

There would also be facilities such as toilets and ramps to cater for the disabled.

Puduraya presently houses southern and northern bound buses at its premises.

The new Integrated Transport Terminal-Southern Sector (ITT-S) in Bandar Tasik Selatan is due to be completed by the end of next year and would see the operations of southern bound buses from Puduraya shifted there.

Minister in the Prime Minister's Department Datuk Seri Nazri Aziz had said that Puduraya would be turned into a city bus terminal, and a new bus hub to cater for northern bound buses would be built either in Gombak or Selayang.

UDA to take over Puduraya Hotel

THE operations of Puduraya Hotel will be taken over by UDA Holdings Sdn Bhd by next year.

This was made known by UDA managing director Datuk Jaafar Abu Hassan at a Press conference yesterday.

Though the hotel was built in 1976, the management and running of the hotel was leased to Puduraya Hotel Sdn Bhd.

“In the past we did not have experience in the hotel industry and thus it was rented out. We have, however, been toying with the idea to take over the running of the hotel for the past six to seven years. Now that we will be spending a lot to refurbish Puduraya, we think it is fit for us to run the hotel as well.”

Jaafar said the hotel would be managed by Uda AnCasa Sdn Bhd by Feb 1.

“We are also taking over the Puduraya Hotel operations in light of the upgrading being carried out in Puduraya.”

Notices too have been served to the current operators of the hotel.

The group presently operates AnCasa Hotel and Spa KL, AnCasa AllSuites Resort & Spa Port Dickson, Jerejak Rainforest Resort Penang, and Kuala Terengganu Golf Resort.
21 - 40 of 395 Posts
The old pic

Temporary bus depot to replace Puduraya
By BAVANI M


THE Federal Territories Ministry has identified a spot in Section 56, Jalan Hang Tuah, for a temporary bus depot while the 30-year-old Puduraya bus terminal undergoes upgrading work.

The site, which is located at the junction of Jalan Pudu and Jalan Galloway, is now used by the police to hold vehicles involved in accidents.

The area is being cleared to enable contractors to start work on phase 1 of the project.

Deputy Federal Territories Minister Datuk M. Saravanan, who visited the site on Friday for the ground-breaking ceremony, said the project was divided into Phase 1 and 2 and was expected to be completed by January 2010.


At the wheel of the excavator: Saravanan launching the groundbreaking ceremony for the temporary bus holding bay.

“Once completed, the depot will be able to take in 135 buses at a time.

“This will ease the traffic congestion in the Pudu area considerably while Puduraya undergoes a facelift,” he said.

Saravanan added that once the depot was ready, the authorities would also be able to ensure only registered buses used the bays to curb congestion.

He said the area, spanning some 1.9ha, would also have facilities like public toilets, bus washing area, rest area for drivers, prayer rooms, changing rooms, and car and motorcycle parking bays.

When asked what would happen to the depot once Puduraya resumed its functions, Saravanan said the land would be used by the government for future contingency plans.

The project is estimated to cost RM6.2mil.

Puduraya is infamous for its congestion, pollution and crime, hence the government felt the need to improve its image for the benefit of passengers.

The facelift, which will cost RM31mil – of which the government will be funding RM25mil with the rest coming from the Urban Development Authority (UDA) – will transform Puduraya into a modern inner-city bus terminal with contemporary design and first-class facilities.

The project is expected to be completed by the end of November 2010.

Saravanan said when Prime Minister Datuk Seri Najib Tun Abdul Razak went on his walkabout in April, the Puduraya area was identified as a major source of the daily massive congestion in Kuala Lumpur and the prime minister had requested that immediate steps be taken to improve the situation.
Depot sokongan siap sebelum raya

Oleh WAN SYAMSUL AMLY
[email protected]



M. Saravanan (dua, kiri) mendengar taklimat daripada Jurutera Projek Jabatan Kerja Awam DBKL, Noor Shafri Pitah (kanan) sewaktu melawat tapak pembangunan Depot Bas Sementara di Jalan Hang Tuah, Kuala Lumpur, baru-baru ini.

--------------------------------------------------------------------------------



KUALA LUMPUR 23 Ogos - Masalah kesesakan lalu lintas yang berpunca daripada bas-bas ekspres beratur dan menunggu penumpang di sepanjang Jalan Pudu sebelum memasuki Hentian Puduraya akan diselesaikan dalam masa terdekat.

Timbalan Menteri Wilayah Persekutuan, Datuk M. Saravanan berkata, kesesakan itu akan dapat dikurangkan apabila pembinaan depot bas sementara di Jalan Hang Tuah, berhadapan Ibu Pejabat Polis (IPD) siap dalam masa tiga minggu lagi.

Tegasnya, buat permulaan, 35 tapak sementara akan disediakan untuk menampung pertambahan bas menjelang musim perayaan tidak lama lagi.

"Kami akan sediakan depot dalam masa tiga minggu lagi. Ia akan mengurangkan kesesakan bas seperti yang berlaku hari ini.

"Kami jangka lalu lintas akan kembali lancar di sepanjang Hentian Puduraya selepas ini. Pembinaan fasa kedua depot ini juga akan dibina dan dijangka siap menjelang awal tahun depan," katanya.

Beliau berkata demikian kepada pemberita selepas majlis pecah tanah tapak pembangunan depot bas sementara itu baru-baru ini.

Tambah Saravanan, projek yang menelan belanja RM6.191 juta itu akan dilaksanakan dalam dua fasa yang meliputi tanah seluas 1.918 hektar.

"Kawasan depot ini akan menyediakan sejumlah 130 tempat letak bas keseluruhannya yang lengkap dengan tempat mencuci dan kawasan rehat pemandu.

"Selain itu, surau, kafeteria, bilik persalinan, pejabat am serta tempat letak kereta dan motosikal pemandu bas juga akan disediakan," ujarnya.

Katanya lagi, sebuah pondok kawalan keluar masuk bas juga akan dibina untuk kemudahan pemantauan serta mengesan sebarang kenderaan 'haram' di situ kelak.

"Fungsi pengawal itu kelak untuk memastikan semua bas di sini mempunyai permit dan sekali gus dapat menyelesaikan masalah bas haram di Hentian Puduraya," katanya.

Jelasnya, tapak sekarang yang digunakan sebagai tempat simpanan barang- barang kes oleh Polis Diraja Malaysia (PDRM) akan dipindahkan ke tapak lain yang sudah dipersetujui mereka.

Tambah Saravanan, pihak-pihak berkepentingan dengan Hentian Puduraya iaitu Dewan Bandaraya Kuala Lumpur (DBKL), Lembaga Perlesenan Kenderaan Perdagangan (LPKP) dan UDA Holdings Bhd. (UDA) diharap dapat memberikan kerjasama sepenuhnya dengan kementeriannya bagi merangka mekanisme dan sistem baru untuk memastikan pergerakan bas akan sentiasa tersusun.

"Kami mahu semua pihak berkenaan meneliti dan memastikan keluar-masuk bas dari depot ini ke Hentian Puduraya dan sebaliknya sentiasa cekap.

"Kami nampak pembinaan projek ini akan mencapai matlamat yang dihasratkan dan masalah 'tradisi' yang menyebabkan kesesakan di Hentian Puduraya menjelang setiap musim perayaan diselesaikan," katanya.
Bus depot to be ready before Hari Raya
By BAVANI M


CONTRACTORS hired to build the much awaited bus holding bay in Jalan Hang Tuah, while Puduraya undergoes a face-lift, have been working round the clock to ensure that phase 1 of the bus depot is ready before Hari Raya.

Once Phase 1 is completed, the bus depot will be able to ease the traffic congestion along Jalan Pudu during the festive season as by then over 30 bus bays would be ready to accommodate the buses.


Solution: The bus holding bay will help ease traffic congestion at Puduraya.

When StarMetro visited the project site on Sunday, workers were already laying out the concrete blocks along the pavements for the bays, and site supervisor N.K Kung said 90% of the work had been completed and that they would be able to hand over the site by Wednesday.

Two weeks ago, at a ground-breaking ceremony, Deputy Federal Territories Minister Datuk M. Saravanan said the temporary bus depot would help reduce congestion caused by buses parked haphazardly along Jalan Pudu.

“Instead of parking along Jalan Pudu, the buses will be able to wait at the holding bay before proceeding to Puduraya to pick up passengers,” he said.

He said the project was divided into Phase 1 and 2 and expected to be completed by Jan 31, next year.


Painstaking task: A worker laying the concrete blocks at the bus holding bay in Jalan Hang Tuah.

Once completed, the depot will be able to accommodate 135 buses at a time.

Also, the authorities would also be able to ensure only registered buses used the bays, to curb touting.

The area, spanning about 1.9ha, will also have facilities like public toilets, bus washing area, rest area for drivers, prayer rooms, changing rooms and car and motorcycle parking bays.

The project is estimated to cost RM6.2mil.
Great news, isnt it.

The terminal is being finished really fast - and after the renovation starts and the buses shift to BTS, it can be used as a holding area for urban buses - get them off the streets finally!

One has to wonder, why did they wait for so long!

Cheers, m
Najib Happy With Improvement At Puduraya Terminal
September 16, 2009 21:15 PM

KUALA LUMPUR, Sept 16 (Bernama) -- Prime Minister Datuk Seri Najib Tun Razak is happy with the changes taking place at the Puduraya Terminal, here.

In a walkabout at the facility Wednesday, he said he was happy that the terminal's management, UDA Holdings Bhd (UDA), had taken the necessary steps to give the terminal a facelift in just 51 days.

"I believe that those using the terminal will feel much better and comfortable now," he said after spending about 15 minutes touring the facilities at the terminal.

This was Najib's second walkabout at the terminal after the first one on April 25 where he called for a better facility for the benefit of consumers.

Najib said a total of RM52 million was allocated to turn the whole Puduraya Terminal into a modern and comprehensive hub, with the first phase of the work, costing RM4.2 million, now completed.

"The second phase will come on stream and in about a year, this place will change radically," he said, adding that he would be visiting the terminal again after the second phase was completed.

Works include expanding the passenger waiting area by three times and putting in place modern lots for business outlets and landscapes around the terminal.

On the Plaza Rakyat project which was abandoned since 12 years ago, Najib said the National Economic Council was looking at it and would make a decision soon.

The Plaza Rakyat project, comprising three buildings of 79 storeys, 49 storeys and 21 storeys for office lots, condominium and hotel respectively, costs around RM1.2 billion.

-- BERNAMA
Najib tinjau Puduraya, Jalan Tuanku Abdul Rahman
26 April 2009 UtusanMalaysia



NAJIB Tun Razak singgah minum di sebuah gerai makan semasa membuat
tinjauan di Hentian Puduraya, di Kuala Lumpur, semalam. Hadir sama Raja
Nong Chik Raja Zainal Abidin, M.Saravanan (dua, kanan) dan Ahmad Fuad
Ismail (dua, kiri). Terdahulu, Najib turut melawat sekitar Jalan Tuanku Abdul
Rahman. – BERNAMA

KUALA LUMPUR 25 April – Tiga minggu selepas Datuk Seri Najib Tun Razak turun padang untuk melawat tiga kawasan di tengah-tengah bandar raya, Perdana Menteri hari ini melakukan satu lagi kejutan berjalan kaki di sepanjang Jalan Tuanku Abdul Rahman dan Hentian Puduraya yang sentiasa sesak dengan lalu-lintas.

Beliau kurang senang dengan kesesakan itu dan ketidakcekapan kemudahan awam semasa melakukan tinjauan selama sejam, kata Menteri Wilayah Persekutuan, Datuk Raja Nong Chik Raja Zainal Abidin.

Najib, yang berpakaian kasual berkemeja warna perang dan seluar berwarna kuning air, tiba di Jalan Tuanku Abdul Rahman dekat Semua House pada 3.20 petang, diiringi oleh Raja Nong Chik, timbalannya, Datuk M. Saravanan dan Datuk Bandar Kuala Lumpur, Datuk Ahmad Fuad Ismail.

Di Jalan TAR, yang terkenal dengan kedai-kedai tekstil dan barang kemas, Najib diberi taklimat oleh Ahmad Fuad mengenai cadangan tempat meletak kenderaan bertingkat berhampiran Semua House dan beberapa rancangan menaik taraf lain di situ.

Beliau meluangkan masa kira-kira 30 minit berjalan di sepanjang lorong berkenaan sambil berhenti berbual dengan peniaga dan orang ramai.

Perdana Menteri kemudiannya menaiki perkhidmatan LRT yang penuh sesak ketika itu. Beliau terpaksa berdiri dari stesen Masjid Jamek ke stesen Plaza Rakyat sebelum berjalan kaki ke Hentian Bas Puduraya yang juga sesak.

Najib turut berhenti di salah sebuah gerai di bangunan itu bagi mendapatkan minuman sejuk.

Beliau yang diiringi pegawainya, menarik perhatian orang ramai yang mengambil peluang untuk bergambar dengan Perdana Menteri.

Seorang wanita yang ternampak kelibat Najib lantas memboloskan diri di tengah-tengah kumpulan orang ramai sambil berteriak: “Saya mahu ambil gambar Perdana Menteri saya”.

Najib kemudian bergerak untuk memeriksa bangunan projek Plaza Rakyat yang lama terbengkalai di sebelah Puduraya sebelum berlepas balik pada 4.25 petang.

Raja Nong Chik berkata, Perdana Menteri menyatakan pandangan berat tentang kurangnya fasiliti dan kesesakan di tempat-tempat tertentu dan mahukan penambahbaikan dilakukan segera.

“Beliau mengalami sendiri, dengan berjalan kaki dan menaiki LRT bersama orang ramai, apa yang mereka terpaksa lalui setiap hari, seperti kesesakan dan pelbagai kesulitan lain, di kawasan sesak.

“Beliau berkata masalah seumpama itu bukan petanda baik buat negara kita yang berusaha menjadi negara maju menjelang 2020. :lol:

“Beliau telah mengarahkan Kementerian Wilayah Persekutuan dan kementerian lain yang berkaitan menentukan kemudahan berkenaan dipertingkatkan demi faedah orang ramai,” katanya.

Mengenai projek Plaza Rakyat, Raja Nong Chik berkata, Najib mahu pemaju diberi kata dua untuk menyiapkannya.

“Perdana Menteri mahukan kami memberikan had masa kepada pemaju menyiapkan projek itu. Jika mereka tidak dapat mematuhinya, kami akan tamatkan kontrak dan cari jalan lain,’’ ujarnya.

“Beliau mahukan projek itu dijalankan semula secepat mungkin,” kata Raja Nong Chik.

Projek, yang pada mulanya menelan kos RM1.2 bilion itu telah diabaikan selama 12 tahun selepas ia bertukar tangan beberapa kali. Pemaju sekarang ialah Global Upline.

Plaza Rakyat dirancang mempunyai tiga bangunan - 79 tingkat, 49 tingkat dan 21 tingkat untuk ruang pejabat, kondominium dan sebuah hotel murah.

Mengenai rancangan menaik taraf kemudahan oleh Dewan Bandaraya Kuala Lumpur bagi mengurangkan kesesakan di Jalan TAR, Ahmad Fuad berkata, projek itu ialah tempat letak kereta bertingkat yang sudahpun bermula.


“Ia bangunan 13 tingkat dan dianggarkan menelan kos RM50 juta. Ia akan menempatkan tempat letak kereta bertingkat, pusat penjaja dan peniaga, dewan pelbagai guna dan ruang pejabat,” jelasnya.

– BERNAMA
PM tinjau lagi Puduraya

Oleh TARMIZI ABDUL RAHIM
[email protected]



Najib Tun Razak bersalam dengan orang ramai ketika melawat projek penambahbaikan fasa pertama Hentian Puduraya petang semalam. Turut mengiringi Perdana Menteri ialah Menteri Kewangan Kedua, Datuk Seri Ahmad Husni Hanadzlah, Menteri Wilayah Persekutuan, Datuk Raja Nong Chik Raja Zainal Abidin dan timbalannya, Datuk M. Saravanan, Pengerusi Lembaga Pelesenan Kenderaan Perdagangan (LPKP), Datuk Halimah Mohd. Sadique serta Pengarah Urusan UDA Holdings Berhad, Datuk Jaafar Abu Hassan. Lawatan tersebut adalah yang kedua selepas yang pertama pada 25 April lalu.

--------------------------------------------------------------------------------


KUALA LUMPUR 16 Sept. - Datuk Seri Najib Tun Razak berbangga dengan prestasi yang ditunjukkan oleh kontraktor dan UDA Holdings Bhd. yang telah berjaya menyiapkan penambahbaikan fasa pertama Hentian Puduraya hanya dalam tempoh 51 hari.

Perdana Menteri percaya orang ramai yang menggunakan Hentian Puduraya dapat melihat dan merasai keadaan lebih baik dan selesa berbanding dengan keadaannya sebelum ini.

Beliau berkata, sejak mengadakan lawatan ke Hentian Puduraya pada 25 April lalu, kerajaan telah mengarahkan penambahbaikan dibuat yang bertujuan untuk menjadikan terminal bas ini sebuah pusat moden, serba lengkap dan selesa.

"Alhamdulillah sejak lawatan itu dalam 51 hari segala tindakan telah dibuat oleh kerajaan dan UDA dan hari ini saya bangga sekali melihat keadaan ini iaitu perubahan yang amat besar berbanding dengan keadaan asalnya.

"Penambahbaikan ini merupakan fasa pertama dengan kos sebanyak RM4.2 juta dan fasa kedua akan menyusul. Kita menjangkakan dalam masa setahun lebih, semuanya akan siap sepenuhnya yang dijangka menelan belanja RM22 juta," katanya.

Beliau berkata demikian kepada pemberita selepas melakukan lawatan singkat ke Hentian Puduraya bagi meninjau sendiri perkembangan usaha penambahbaikan terminal bas itu.

Hadir sama, Menteri Kewangan Kedua, Datuk Seri Ahmad Husni Hanadzlah, Menteri Wilayah Persekutuan, Datuk Raja Nong Chik Raja Zainal Abidin dan Timbalannya, Datuk M. Saravanan serta Pengerusi Lembaga Pelesenan Kenderaan Perdagangan (LPKP), Datuk Halimah Mohd. Sadique.

Perdana Menteri yang tiba di Hentian Puduraya pada pukul 5.20 petang telah meninjau tingkat mezanin yang menempatkan ruang menunggu yang selesa dan berhawa dingin serta bilik kawalan kamera litar tertutup (CCTV).

Najib juga meninjau laluan pejalan kaki berbumbung yang terletak di bahagian luar hentian itu dan menyambungkan terus ke Stesen LRT STAR Bandaraya yang turut terkandung dalam penambahbaikan fasa pertama itu.

Perdana Menteri berkata, fasa kedua akan menyediakan kemudahan dan keselesaan kepada penumpang sehingga tiga kali ganda daripada asal.

Malah, katanya, para peniaga juga akan memperoleh lot kedai yang lebih moden dan luas serta selesa, selain daripada keseluruhan kawasan Hentian Puduraya itu akan diperluaskan menjadi lebih indah dan moden, sekali gus bakal menjadi mercu tanda terbaharu Kuala Lumpur.

Pada 25 April lalu, Perdana Menteri telah melakukan kejutan dengan berjalan kaki di sepanjang Jalan Tuanku Abdul Rahman dan Hentian Puduraya yang sentiasa sesak dengan lalu lintas.

Beliau menyaksikan sendiri kesesakan itu dan ketidakcekapan kemudahan awam semasa melakukan tinjauan selama sejam itu.

Najib kemudiannya menaiki perkhidmatan LRT yang penuh sesak ketika itu. Beliau terpaksa berdiri dari Stesen Masjid Jamek ke Stesen Plaza Rakyat sebelum berjalan kaki ke Hentian Puduraya yang juga sesak.
Air-conditioned waiting room







Wo...can't imagine the old interior design anymore!!!
Puduraya kini moden

Oleh MUHAMMAD DAYNE AZMIN dan NOR SAIDATULAKMA HAMKA
[email protected]



HENTIAN Puduraya menyediakan tempat duduk lebih selesa bagi penumpang sebelum menaiki bas untuk ke destinasi selepas menjalani proses naik taraf yang menelan belanja RM22 juta untuk fasa pertama. - UTUSAN/SHAIFUDIN MOHD. NOR

--------------------------------------------------------------------------------



KUALA LUMPUR 22 Sept. - Penambahbaikan fasa kedua Hentian Puduraya dijangka lebih menyeluruh dengan pelbagai kemudahan asas kepada orang ramai bakal ditingkatkan.

Pengarah Urusan UDA Holdings Berhad, Datuk Jaafar Abu Hassan berkata, apabila penambahbaikan bernilai RM22 juta itu siap, terminal bas berkenaan akan lebih moden dan tersusun dari segi kemudahannya.

Katanya, antara penambahbaikan yang akan diberi tumpuan adalah kawasan menunggu di tingkat bawah Hentian Puduraya.

"Kawasan menunggu di bawah akan disediakan kemudahan berhawa dingin serta ditambah tiga kali ganda keluasannya di samping gerai dan medan selera kini yang berada di tingkat berkenaan akan dipindahkan ke tingkat atas berbumbung," katanya ketika dihubungi hari ini.

Baru-baru ini, Perdana Menteri, Datuk Seri Najib Tun Razak membuat lawatan singkat ke Hentian Puduraya bagi meninjau perkembangan usaha penambahbaikan terminal bas tersebut.

Najib ternyata berbangga dengan prestasi yang ditunjukkan UDA Holdings yang berjaya menyiapkan penambahbaikan fasa pertama itu dalam 51 hari.

Bagi fasa kedua, Najib berkata, ia akan menyediakan kemudahan dan keselesaan kepada penumpang sehingga tiga kali ganda daripada asal.

Mengulas lanjut, Jaafar berkata, antara kemudahan lain yang akan dipertingkatkan ialah penggunaan lif dan penambahbaikan sistem siar raya.

"Masalah kesesakan sebelum ini akibat ruang yang sempit tidak akan berlaku lagi apabila kedua-dua kemudahan itu ditingkatkan," jelasnya.

Beliau berkata, kemudahan surau baru akan dibina kepada orang ramai dan ia akan ditempatkan di tingkat bawah berbanding tingkat dua sebelum ini.

"Surau baru ini lebih luas dan mampu menampung bilangan orang ramai yang ingin bersolat terutama waktu maghrib," katanya.

Tambah Jaafar, satu lagi kemudahan baru yang akan disediakan UDA Holdings ialah kemudahan tempat permainan untuk kanak-kanak.

"Ia memberi keselesaan kepada ibu bapa yang mempunyai anak-anak kecil sementara menunggu waktu perjalanan.

"Semua kemudahan ini yang memakan kos RM22 juta dijangka siap hujung 2010 atau awal tahun 2011," katanya.
whoaaaa................!!!!!!!xnmpk mcm kat MALAYSIA....
Air-conditioned waiting room







actually it was a car park before if i'm not mistaken...that's why the upgrading work take a very shot time.
Wo...can't imagine the old interior design anymore!!!
come on lah...abistu, KLIA nampak cam negara mana? Germany? :D jangan rendahkan negara sendiri, ok. pergi lah keluar bersiar-siar di hujung minggu lihat betapa cantik Malaysia ni sebenarnya....

it's another testimony of Najib's high performing approach. just look at how he upgraded the pedestrian walkway in Kampung Baru. very nice. sadly, those 'orang kampung' don't appreciate that...dah kotor...
whoaaaa................!!!!!!!xnmpk mcm kat MALAYSIA....
itu airport...............maksud saya,puduraya xnampak macam stesen bas ekspres yang lain di malaysia
come on lah...abistu, KLIA nampak cam negara mana? Germany? :D jangan rendahkan negara sendiri, ok. pergi lah keluar bersiar-siar di hujung minggu lihat betapa cantik Malaysia ni sebenarnya....

it's another testimony of Najib's high performing approach. just look at how he upgraded the pedestrian walkway in Kampung Baru. very nice. sadly, those 'orang kampung' don't appreciate that...dah kotor...
Depoh bas jalan Hang Tuah



arief, what this vid got to do with puduraya?:eek:hno:
sori.............post salah thread lah..........
21 - 40 of 395 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top