If dmk wins forget all of this!
Only way is to at least fastly complete 50% of integrated bus stand work so that they can't withdraw the plan. And also road extension work is going on at podanur-chettipalayam route. 15 feet extended now.
 

·
Registered
Joined
·
1,303 Posts
Election drama! Notting is going to happen
As usual making public fools

Doesnt looks like an election drama. Things are happening in background. VV

Looks like Gandhipuram bus stand singanallur bus stand are getting converted to shops and multilevel car parking.

Tenders are nearing its completion dates for feasibility studies.

Also as per the latest Press news Smart city works in Valankulam near 80% completion , this project is part of the Central Government's Smartcity (!!!???!!!)
If its smartcity project, A state government cannot simply scrap them. It will then become an ego issue. I never seen this scenario happened in any state after an opposition won.

Also the days had changed. If DMK scrap this project in future, it will be a big backslash for them as Social media is more stronger these days and oppositions will be waiting for such opportunities to mock them. This is just 150 crore project and DMK wont risk their name for such a small one.
 

·
Registered
Joined
·
1,308 Posts
Doesnt looks like an election drama. Things are happening in background. VV



Also as per the latest Press news Smart city works in Valankulam near 80% completion , this project is part of the Central Government's Smartcity (!!!???!!!)
If its smartcity project, A state government cannot simply scrap them. It will then become an ego issue. I never seen this scenario happened in any state after an opposition won.

Also the days had changed. If DMK scrap this project in future, it will be a big backslash for them as Social media is more stronger these days and oppositions will be waiting for such opportunities to mock them. This is just 150 crore project and DMK wont risk their name for such a small one.
DMK was proposing Multi level parking during their 2006 to 2011 rule. Gandhipuram flyover design was 2 tier and was completely different than compared to what implement now.
 

·
Registered
Joined
·
107 Posts
DMK was proposing Multi level parking during their 2006 to 2011 rule. Gandhipuram flyover design was 2 tier and was completely different than compared to what implement now.
Yes Absolutely
The old gandhipuram Flyover plan was amazing
5B8434DF-1DA1-418E-873F-81174032F50D.jpeg

But the current Ruling Party completely changed the design

Likewise if the Avinashi Road flyover construction starts
Definitely we can forget Metro Project for our entire Lifetime

(No Space for Metro Construction and not even for Monorail Construction)

Something is better than nothing.
But it should not be a hindrance to other Major Project like Metro
 

·
Registered
Joined
·
35 Posts
Yes Absolutely
The old gandhipuram Flyover plan was amazing
View attachment 773057
But the current Ruling Party completely changed the design

Likewise if the Avinashi Road flyover construction starts
Definitely we can forget Metro Project for our entire Lifetime

(No Space for Metro Construction and not even for Monorail Construction)

Something is better than nothing.
But it should not be a hindrance to other Major Project like Metro
State highways have got clearance from cmrl for the flyover
Cmrl said no issues with flyover
After getting clearance only state highways approved this project
So stop overthinking
 

·
Registered
Joined
·
3 Posts
State highways have got clearance from cmrl for the flyover
Cmrl said no issues with flyover
After getting clearance only state highways approved this project
So stop overthinking
Hi Guys, I am a long time passive member of this forum for years now.
Lets be completely optimistic about Metro for Coimbatore. In face of adversity (current situation) that we really need to be tightening the screws and remain thoroughly optimistic about things. We should and will continue to press our case for Metro citing all other smaller cities having already gone much ahead with Metro plans.
That being said, considering our past record, we should also be happy for whatever is coming our way too in terms of infrastructural development.
 

·
Registered
Joined
·
19 Posts
Hi Guys, I am a long time passive member of this forum for years now.
Lets be completely optimistic about Metro for Coimbatore. In face of adversity (current situation) that we really need to be tightening the screws and remain thoroughly optimistic about things. We should and will continue to press our case for Metro citing all other smaller cities having already gone much ahead with Metro plans.
That being said, considering our past record, we should also be happy for whatever is coming our way too in terms of infrastructural development.
But coimbatore definitely deserves metro system. The number of people using public transportation is large here.
 

·
Registered
Joined
·
1,303 Posts
But coimbatore definitely deserves metro system. The number of people using public transportation is large here.
Forget about the Metro, we didn't even have Air-conditioned buses. Being the rich city and people afford to pay as much as they charge and being an educational hub, we didn't even have the well-deserved Air-conditioned buses. In this situation, Metro may be far from reality. All the parties does the fake promises and run away.

But this time, both the state parties and both the central parties promised metro for Coimbatore, so no more play. It will be just an yes or no. Lets have to wait and watch.
 

·
Registered
Joined
·
8 Posts
State highways have got clearance from cmrl for the flyover
Cmrl said no issues with flyover
After getting clearance only state highways approved this project
So stop overthinking
CMRL has issued NOC for this avinashi road flyover project. actually CMRL is initial stage for this Coimbatore metro, they cannot say anything about this project and it should not issue the noc for this flyover project. this would be reason for not getting metro in Coimbatore in future.

No politician and public are interested in this metro project. this is big issue in Coimbatore. Chennai is stated phase 2 work. but Coimbatore is still under feasibility study for last 10 years.

If we get approval for metro, the project will implement after completion of this avinashi raod fly over project. so we must wait another 5 years.
 

·
Registered
Joined
·
1,303 Posts
Heard that the bus stand construction is visible from the Podanur Chettipalayam main road. Anyone got latest snaps?

Heard that some buses may be operatingfrom new bus stand before election to gain some political attention, is that true?

Also looks like SPV is visiting the place very frequently and now got new securities on the entrance to stop the press from taking photos and videos? Why are they keeping it so surprise?
 

·
Registered
Joined
·
342 Posts
Few RC of building blocks completed and works going on.

I guess all most all pillars are till roof level.

Security didn’t allow near building.
Thanks for the update. Not sure why even the print media (especially tamil newspapers) are not publishing any updates regarding the Vellalore Integrated bus stand.
If the security guys are not allowing near the building, then using drone video camera will be the best option if we really need the current status update. As if its a millitary establishment, the security personnel are preventing the people to take a look at the project which is constructed for public use.
 