Site undergoing piling.
Site as of Sep. The groundworks are now complete, with the 240-plus piles all covered up and preparations are being made for the next stage.


Site as of Sep. The groundworks are now complete, with the 240-plus piles all covered up and preparations are being made for the next stage.
