1. Tramwaje Warszawskie


Electric trams were inaugurated in Warsaw just in 1908. Now we have 119 km network + 2 km u/c.

link to the existing network plan: http://www.ztm.waw.pl/images/schematy/060701tram.gif

new line u/c


- trams
All Trams (441) come from Konstal plant in Chorzow (now part of the Alstom). There are also ongoing and planned tenders for modern trams.



13N from 60's - progressively retired


105Na-z - main model




112N-116Na - low floor in 60%

See less See more
9
  • Like
Reactions: 3
1821 - 1836 of 1836 Posts
Thanks!
Now I understand.
Perhaps the best solution would be for part of the M3 to be a branch of the M2, so that Praga district would be better connected to the centre.
(y)
It's imposible because of the existing double Stadion Narodowy station. All M3 plans are an effect of that station.
See less See more
new version of map presenting future vision of Warsaw's metro network :


See less See more
  • Like
Reactions: 5
new version of map presenting future vision of Warsaw's metro network :

View attachment 4132735
Plan is not coordinated with PKP (railway expansion plan) which is damn stupid


PKP Plans:
  • Southern circular (Żwirki i Wigury - Wilanowska - Wawer/Gocławek)
  • 2nd East-West connection (Wileńska - Główna/Pl. Zawiszy)
  • N-S (Gdańska - Airport)
Looking at the map, PKP would make the Line run along the planned M3 Metro line and the central part of M4 N-S line.
The map of the planned Metro does not show SKM (S-Bahn lines).

2nd E-W line will go more or less: Wileński (M2) - Old Town - Ratusz Arsenał (M1) - Daszyńskiego - Główna/Pl. Zawiszy
Great line for in-city transport.
IMHO N-S line should be a metro line, and PKP should not be doing it.

For better or for worse these plans should be coordinated, and adjusted with each other. Transfer stations, and construction schedule should be planned, (looking at a missed opportunity on M2/rail circular (M2 Szwedzka - PKP Targówek - M2 Targówek)

I see none of this at all.

Src in PL: Kolejowy master plan dla Warszawy: Cztery tory i nowe linie kolejowe
See less See more
  • Haha
  • Like
Reactions: 3
Škoda Varsovia on M2 line by me

M2 Młynów Station





M2 Młynów Station
See less See more
4
  • Like
Reactions: 5
Work on the next western sections of the second metro line is finally starting.

Although the actual ground preparation and fencing off of the alloted land probably won't start properly until after the New Year when everyone returns to work.

This week, Warsaw handed over the land for the construction of Karolin, Chrzanów and Lazurowa stations to the contractor.

Yesterday, the City Council of the Capital City of Warsaw secured PLN 507 million in the 2023 budget for the implementation of this investment.

Karolin, Chrzanów and Lazurowa stations are hoped to be completed by 2024.
See less See more
  • Like
Reactions: 3
I think the planned opening date has been moved to 2026
  • Sad
Reactions: 1
The first preparation works for Lazurowa station:







Photos by sams_:

See less See more
3
  • Like
  • Haha
Reactions: 5
The history of Russian trains in the Warsaw metro. please turn on English subtitles.
  • Like
Reactions: 3
Preparation work for Chrzanów station:







Photos by netlest:

See less See more
3
  • Like
Reactions: 5
As part of Kyiv’s support, the Warsaw Metro may transfer to the Ukrainian company 10 six-car trains of the 81st series, which have already been decommissioned in the Polish capital. The document, signed by the authorities of the Polish and Ukrainian capitals, also includes a declaration of support in the supply of spare parts for rolling stock and assistance in the exchange of knowledge and experience necessary for the modernization of Ukrainian trains. Series 81 trains operated by the Warsaw Metro are structurally very similar to those used in Kyiv.
See less See more
  • Like
Reactions: 5
Now it's official. City authorities have revealed new long term plan for 113 km long metro network with 5 lines and 103 stations. New tram lines are also planned.








See less See more
3
  • Like
Reactions: 5
An ambitious plan indeed.

Great if finances allows for it.
  • Like
Reactions: 5
These are just studies which have been going on since 2018, nothing concrete (literally).

Quote from article:

"What's more - the implementation of many investments, e.g. three new metro lines, is a perspective of several decades - provided that financing is ensured".

Western extension of M2 to Karolin is already under the earliest stages of construction (securing the sites). No actual tunnel boring has begun.

Flying over the new section of M2 (Karolin-Lazurowa) (under construction), material from February 2023:

See less See more
  • Like
Reactions: 4
SKM (Warsaw Rapid Urban Rail) launches two new lines S4 and S40: from Piaseczno to Warsaw and Wieliszew.

On Sunday, March 12 For the first time, the trains of the new Rapid Urban Railway line – S4 will run on the tracks. It will connect Piaseczno, via Warszawa Gdańska, with Wieliszew. A day later, trains of the S40 line will start, which will serve the Piaseczno – Warszawa Główna route on weekdays.






See less See more
  • Like
Reactions: 4
A cement works erected in preparation for the construction of M2 Bemowo - Karolin:



The skyline of Warsaw city centre in the distance.



Groundwork preparation on the site of the future Karolin metro station:



Trees felled near the future site of Karolin metro station:



Utilities in the area are currently being rereouted because of the works. Sochaczewska Street (in the vicinity of the future Karolin metro station) has been temporarily narrowed to accommodate this.

Photos posted by @Akonek in the Polish forum.

Lazurowa, Chrzanów and Karolin stations will not be operational until 2026 at the earliest.