SkyscraperCity Forum banner
Status
Not open for further replies.
1 - 20 of 707 Posts

·
hlubach bubach
Joined
·
9,635 Posts
Eee, to majstore, vidim bas si se fino potrudil oko otvaranja novog threada :D
BTW, cestitam na danasnjem prolazu :)
 
  • Like
Reactions: Ellie_zgb

·
hlubach bubach
Joined
·
9,635 Posts
Ako rijesavas ispite kao kaj otvaras nove zagrebacke threadove, onda tih 25 ispita ti ne bu predstavljalo nikakav problem :D ;) :jk:

:cheers:
 

·
Streetwalker
Joined
·
8,025 Posts
Zagreb Construction List .....

OK Kids, Mama's been in the kitchen long time cooking up a treat. Here are the ingredients as promised. Let me know if anything is missing (the head chef Mr Long Foot will know best! ) Enjoy :D .......

Zagreb Construction Projects

Office Buildings

EuroTower 1 – 26 levels – U/C
EuroTower 2 – 13 levels – In preparation
Zagreb Tower – 22 levels + 8 levels – U/C
Almeria Tower – 15 levels + 8 levels – U/C
Hypo Centre – 11 levels (4 building complex) – U/C
Business Centre International – 13 levels + Hotel & Retail – U/C
Centar Projekt – 11 levels – U/C
VMD Centre – 9 levels – Completed
SPAZ Office Bldg – 9 levels – U/C
Grand Centre – 9 levels – U/C
Business Centre 2000 – 9 levels (4 building complex) – U/C
Boston Global Centre – 6 levels – Completed
Emporion Centre – 6 levels – U/C
Knežija Office Building – 11 levels – U/C
InGrad Complex – 6 levels – U/C
Savska 3 – 4 levels – U/C
Vukovarska 296a – 9 levels – In preparation
Erste Bank Tower – 26 levels – On hold
Raiffesen Bank Tower – 15 levels – Proposed
Bank of Zagreb Tower – 30 levels – Proposed
Jadran Site – Office Tower Complex – Proposed
Siemens Site – 9 level Tower – Proposed
Zagrebčanka Site – 100,000sqm site – Multi tower proposals
Radnička – Hektorovićeva – Supilova – Bunićeva – Multi building complex – Proposed
HOTO Tower – 16 levels – Completed
VMD Promet – 9 levels – Completed
Croatia Osiguranje – 7 levels – Completed
Eurocentre – 6 levels – Completed
Europapress – 6 levels – Completed
Pliva Institute – 6 levels – Completed
Neboder – 17 levels – Reconstruction / Rennovation
Parmolin Site – 19C industrial conversion – TBA
Buzin Commercial Centre – New secondary Zagreb CBD - Proposed

Housing Estates & Apartment complexes

Hotoville – Largest private residential (inc shopping centre) – U/C
Vrbani 3 – Multi building apartment project – U/C
Špansko – 30 building apartment project – U/C
Hypo Apartments – 4 building complex – U/C
Njivice – 17 hectare site south of Vukovarska street to be transformed into new residential area by Geoprojekt – Proposed
Sesvete – New housing complex on former brickworks (inc 60,000 sqm shopping centre) – In planning
Branimirova – Multi building complex – In preparation.
Folnegovićeva naselja – New multi level apartment complexes up to 10 levels tall – Proposed
Bednjanska street – Apartment complex – U/C

Shopping Complexes

GTC Retail and Business Complex – 32,000sqm multi-level shopping complex with multi level office tower (8000sqm) – U/C
Zagreb Shopping City – 700,000 sqm complex includes retail, offices and entertainment zone all-in-one – In Preparation
Zagreb Fair – Huge shopping and entertainment complex next to Zagreb Exhibition Complex – In Planning
Billa Centre – In planning

Public buildings

Zagreb Congress Centre – In planning
Zagreb Airport Passenger Terminal – In planning
Rebro Hospital – Expansion – U/C
University Hospital – U/C
Mimara Underground parking complex – In planning
Tuškanac Underground parking complex – In planning
Josip Lang Square Underground parking complex - Completed
Kvaternik's square redevelopment – In preparation
Emergency Control Centre – 6 levels – In preparation
Ministry of Justice – U/C
Trešnjevska Square – redevelopment – In planning

Hotel / Recreational Complexes

Hotel Antunovic – 9 levels – U/C
Aqua City – Thermal Spa and Aquatic Centre – In planning
Hotel International - U/C

Sports complexes

Maksimir Stadium – U/C
Svetice Olympic Pool – In preparation
Utrina Swimming Complex – Completed
Handball Complex Svetice – In preparation
Handball Complex Špansko – U/C
Sports & Recreation Complex ‘Chromos Savica’ – In planning
Sports & Recreation Complex Sesvete – In planning

Infrastructure

Domovinski Bridge – U/C
Jankomirski Bridge – U/C
Junction Slavonska/Heinzelova – Completed
Zagreb Metro – Proposal
Nova Branimirova – Road expansion / extension – U/C
Šarengradska Project – New roadway from Jadranski Bridge to Cibona Tower – In preparation

Religious

Zagreb’s Great Synagogue & Jewish Museum – In planning (2006 start)

Museums and Arts complexes

Museum of Contemporary Arts (MCA) – U/C
Zagreb Academy of Music – In preparation
Zagreb Centre for Dance - In preparation
Zagreb Histrionics Centre - In preparation
Zagreb Modern Opera – In planning
Zagreb Museum of Architecture - In planning
Zagreb Gallery of Naive Arts - In preparation
Zagreb Musuem of Natural History - In planning
Zagreb Musuem of Sport - In planning
Badel Exhibition Centre - In planning


As you can see Zagreb is one very busy construction city :yes:

BTW - "U/C" denotes "Under Construction" :)
 

·
hlubach bubach
Joined
·
9,635 Posts
^ Nicely summarized, SinCity :)

Does anybody know where this is ? ;)



 

·
Streetwalker
Joined
·
8,025 Posts
Thanks. If you only knew what a bastard it was to round up all the information. Just nobody dare ask me to supply images for every project above .... LOL :D

BTW - The pics above are of Croatia Osiguranje's new HQ, completed late last year. Its quite an interesting and nice building BTW.

The images above dont show the full beauty of this structure. Long Foot has quite a nice photo collection of this building that he has taken over previous months :)
 

·
hlubach bubach
Joined
·
9,635 Posts
Eurotower has new website, it is totaly redesigned, just fresh news is missing ;)
Two rendered images from their website :





^ Is this the northern tower that is supposed be twice smaller than his southern twin (26 stories) ?
:)
 

·
hlubach bubach
Joined
·
9,635 Posts
SinCity said:
Thanks. If you only knew what a bastard it was to round up all the information. Just nobody dare ask me to supply images for every project above .... LOL :D

BTW - The pics above are of Croatia Osiguranje's new HQ, completed late last year. Its quite an interesting and nice building BTW. The images above dont show the beauty of this building. :)
Yup, you did great job on collecting infos on each project! :)
....But i was gonna ask ya about the pics lol :D..well nevermind ;) :jk:

I think the first image isnt really anything special, but the other one - below, i think it shows what a cool structure that buulding is :)
 

·
otišao i neće se vratiti
Joined
·
7,077 Posts
Discussion Starter · #12 ·
SinCity said:
The images above dont show the full beauty of this structure. Long Foot has quite a nice photo collection of this building that he has taken over previous months :)
Yep, and Bubach can find them in one of previous ZAgreb update threads. Come on, bubach, don't be lazy, search, it is your kvart :D
 

·
Streetwalker
Joined
·
8,025 Posts
Thats the bigger one. The smaller one "was" owned by someone else but I hear its all one complex now. The smaller tower will probably start once they finish the taller one at the end of this year. Our EuroTower thread has updated images thanks to Long Foot. The glass facade is now coming up. :yes:
 

·
hlubach bubach
Joined
·
9,635 Posts
I've seen those old ones many times, i just thought these new ones would show the building in a little different exposition that we didnt see yet :)... but well....screw ya all :D ;)

Thanks SC, it really looked confusing to me, besides in the renderings it seems to be way too close to Vukovarska street where the shorter tower is supposed to be.

:cheers:
 

·
otišao i neće se vratiti
Joined
·
7,077 Posts
Discussion Starter · #15 ·
Sincity, nice suma sumarum, but there are some small mistakes on your list:

VMD center - it is completed
Boston Global Centre – completed
Zagreb Shopping City - it is not U/C yet
University Hospital – it is U/C last 20 years :D
Šarengradska, it is not U/C yet
Emergency Control Centre – 6 levels – it is not U/C yet
Ministry of Justice – is U/C
Handball Complex Špansko – not U/C yet

;)
 

·
Streetwalker
Joined
·
8,025 Posts
long foot said:
Yep, and Bubach can find them in one of previous ZAgreb update threads. Come on, bubach, don't be lazy, search, it is your kvart :D
Yeah, I agree, Bubach can kill some time by hunting down all of the images from parts 1-6 of the Zagreb construction update threads. ;) :jk:
 

·
Streetwalker
Joined
·
8,025 Posts
long foot said:
Sincity, nice suma sumarum, but there are some small mistakes on your list:

VMD center - it is completed
Boston Global Centre – completed
Zagreb Shopping City - it is not U/C yet
University Hospital – it is U/C last 20 years :D
Šarengradska, it is not U/C yet
Emergency Control Centre – 6 levels – it is not U/C yet
Ministry of Justice – is U/C
Handball Complex Špansko – not U/C yet

;)
No problemo. Thats why I ask the experts. I'll correct them. Let me know if there is anything else to add or change.

Pozdrav :)
 

·
otišao i neće se vratiti
Joined
·
7,077 Posts
Discussion Starter · #18 ·
bubach_hlubach said:
I've seen those old ones many times, i just thought these new ones would show the building in a little different exposition that we didnt see yet :)... but well....screw ya all :D ;)
Bubachu, bubachu, isprobao sam sve moguće kuteve za slikanje, preostaje mi još jedino da unajmim helikopter pa slikam iz zraka ;)
 

·
hlubach bubach
Joined
·
9,635 Posts
long foot said:
Sincity, nice suma sumarum, but there are some small mistakes on your list:

VMD center - it is completed
Boston Global Centre – completed
Zagreb Shopping City - it is not U/C yet
University Hospital – it is U/C last 20 years :D
Šarengradska, it is not U/C yet
Emergency Control Centre – 6 levels – it is not U/C yet
Ministry of Justice – is U/C
Handball Complex Špansko – not U/C yet

;)
LF, you are so picky sometimes. Look, when an idea was born and is about to start to get realized, at least on paper lol...it automaticaly considers to be an U/C thing :D
 

·
otišao i neće se vratiti
Joined
·
7,077 Posts
Discussion Starter · #20 ·
bubach_hlubach said:
LF, you are so picky sometimes. Look, when an idea was born and is about to start to get realized, at least on paper lol...it automaticaly considers to be an U/C thing :D
Well, we have nice collection of those "on the paper" projects, lets see the most important: Erste banka, Zagrebačka banka, Reifeisen banka, University hospital, Badel area redevelopment, metro project, new airport... ;) :D
 
1 - 20 of 707 Posts
Status
Not open for further replies.
Top